Skip to Content.
Sympa Menu

sphenix-maps-l - Re: [Sphenix-maps-l] MVTX cables tested

sphenix-maps-l AT lists.bnl.gov

Subject: sPHENIX MAPS tracker discussion

List archive

Chronological Thread  
  • From: "Liu, Ming Xiong" <mliu AT lanl.gov>
  • To: Jo Schambach <schambachjj AT ornl.gov>, "sphenix-maps-l AT lists.bnl.gov" <sphenix-maps-l AT lists.bnl.gov>
  • Subject: Re: [Sphenix-maps-l] MVTX cables tested
  • Date: Wed, 26 Apr 2023 23:09:26 +0000

Hi Jo,

Correct, this is L2_06, a different one.

I am glad the cable is good as we manually locked it to the connector at PP3 during the installation.

 

Cheers,

Ming

 

 

-----

signature_61897647

 

Dr. Ming Xiong Liu

P-3, MS H846

Physics Division

 

Office: 505.667.7125

Mobile: 505.412.7396

Los Alamos National Laboratory

 

 

From: sPHENIX-MAPS-l <sphenix-maps-l-bounces AT lists.bnl.gov> on behalf of SPHENIX MVTX <sphenix-maps-l AT lists.bnl.gov>
Reply-To: Jo Schambach <schambachjj AT ornl.gov>
Date: Wednesday, April 26, 2023 at 5:06 PM
To: Ming Liu <mliu AT lanl.gov>, SPHENIX MVTX <sphenix-maps-l AT lists.bnl.gov>
Subject: Re: [Sphenix-maps-l] MVTX cables tested

 

Looks unlikely. The stave was L1_07 and this looks like it belongs to a stave in L2 instead?

 

Joachim Schambach

Oak Ridge National Laboratory

PO Box 2008

Bldg. 6000, MS 6368, Rm 205-C

Oak Ridge, TN 37831-6368

Phone: (865) 341-0694

Email: schambachjj AT ornl.gov

 

From: Liu, Ming Xiong <mliu AT lanl.gov>
Sent: Wednesday, April 26, 2023 5:33 PM
To: Schambach, Jo <schambachjj AT ornl.gov>; sphenix-maps-l AT lists.bnl.gov
Subject: [EXTERNAL] Re: [Sphenix-maps-l] MVTX cables tested

 

Hi Jo and all,

This is fantastic news, congratulations!

About one possibly broken cable –

Is this the SamTec-cable-04 which as a broken latch at PP3 or a different cable? See attached photo.

 

Cheers,

Ming

 

 

 

-----

Image removed by sender. signature_61897647

 

Dr. Ming Xiong Liu

P-3, MS H846

Physics Division

 

Office: 505.667.7125

Mobile: 505.412.7396

Los Alamos National Laboratory

 

 

From: sPHENIX-MAPS-l <sphenix-maps-l-bounces AT lists.bnl.gov> on behalf of SPHENIX MVTX <sphenix-maps-l AT lists.bnl.gov>
Reply-To: Jo Schambach <schambachjj AT ornl.gov>
Date: Wednesday, April 26, 2023 at 3:17 PM
To: SPHENIX MVTX <sphenix-maps-l AT lists.bnl.gov>
Subject: [Sphenix-maps-l] MVTX cables tested

 

All cables in the MVTX detector have been tested, and all but one data cable to a stave look OK.

We are unable to communicate with one of the staves. The cable from the electronics rack on the platform in 2E1 to patch panel PP3 in the bore had a bad connector on it that has been replaced by Cameron, but unfortunately, this didn’t fix the problem.

We can currently not access PP3 until Friday. Once we have access again, we will check the connection at PP3 to determine if the problem is there.

In the process we also tested all Readout Units and Power Units for their correct installation and functionality and fixed all issues with those.

All of the CAEN power supplies seem to be correctly hooked up and functional. We tested the (PLC based) interlocks and found that all LV supplies seem to be interlocked correctly, and respond to temperatures out of range in the staves. The one interlock system yet to be completed is the supplies for the BackBias voltage, which will be completed in the next couple of days (needed to assemble some new patch cables for those interlocks).

 

Best,

Jo

 

--

Joachim Schambach

Oak Ridge National Laboratory

PO Box 2008

Bldg. 6000, MS 6368, Rm 205-C

Oak Ridge, TN 37831-6368

Phone: (865) 341-0694

Email: schambachjj AT ornl.gov

 

_______________________________________________ sPHENIX-MAPS-l mailing list sPHENIX-MAPS-l AT lists.bnl.gov https://lists.bnl.gov/mailman/listinfo/sphenix-maps-l

_______________________________________________ sPHENIX-MAPS-l mailing list sPHENIX-MAPS-l AT lists.bnl.gov https://lists.bnl.gov/mailman/listinfo/sphenix-maps-l




Archive powered by MHonArc 2.6.24.

Top of Page