sphenix-physics-l AT lists.bnl.gov
Subject: sPHENIX discussion of physics
List archive
[Sphenix-physics-l] FW: MVTX workfest Dec. 5-7 @Santa Fe
- From: "Huang, Jin" <jhuang AT bnl.gov>
- To: "sphenix-hf-jets-l AT lists.bnl.gov" <sphenix-hf-jets-l AT lists.bnl.gov>
- Cc: "sphenix-physics-l AT lists.bnl.gov" <sphenix-physics-l AT lists.bnl.gov>
- Subject: [Sphenix-physics-l] FW: MVTX workfest Dec. 5-7 @Santa Fe
- Date: Thu, 31 Aug 2017 15:05:53 +0000
Please find below the first announcement of the MVTX workfest Dec. 5-7 @Santa Fe, a pre-meeting to the Dec collaboration meeting. As Ming highlighted, the main goal for this workfest is working towards the full MVTX proposal, for which our topical group plays important roles in both refining the detector simulation and in further developing the physics cases.
We would like to invite you to join this workfest. Please mark your calendar. The logistic info will be announced later.
Best regards
Xin & Jin
______________________________
Jin HUANG
Associate Physicist Brookhaven National Laboratory Physics Department, Bldg 510 C Upton, NY 11973-5000
Office: 631-344-5898 Cell: 757-604-9946 ______________________________
From: Ming Liu (ming AT bnl.gov) [mailto:ming AT bnl.gov]
Dear all,
Following the very positive recommendations from the recent MVTX BNL Directors Review, we propose to move forward to prepare for the full proposal submission to DOE by early 2018 (~Jan. 2018?).
After some discussions, we think a dedicated workfest in early December before the sPHENIX Collaboration Meeting would be timely to push for the completion of the full proposal by the end of this year.
MVTX workfest: Dec. 5-7 (Tue-Thu.), 2017, Santa Fe, NM sPHENIX Collaboration: Dec. 8-10, Santa Fe, NM
Here is a summary of action items and proposed timelines (draft, to be discussed with ALD and review committee ) following the Directors Review Recommendations:
1. Solicit multiple theory predictions – December 2017 2. Refine the three key physics plots – October 2017 3. MoU with CERN for stave production – December 2017 4. Refine cost estimate with CERN – DONE 5. QA plan for tests (readout and cooling needs at LBNL and BNL) – October 2017 6. Cost of building two inner layers – DONE 7. Scenarios for repair and replacement – October 2017 8. Refine estimates for engineering design - End September- 2017 9. Include Cost of Extension cables – End September 2017 10. Consider including UV sterilization of demineralized water in cooling plant, October 2017 11. MoU with key production sites – December 2017 12. Optimize design of INTT and MVTX simultaneously – Feb-March 2018 – this will need sometime 13. Re-evaluate mechanical engineering costs once INTT and MVTX are final – after March 2018 (– too late?). - related to #8 & #9, here one should make sure that the contingency is properly estimated to absorb cost variations due to different designs. realistic contingency on carbon structures – End September 2017 14. Develop a Project Management Plan – September 2017, a draft available – how detailed this plan needs to be at this stage of the project, further discussion with ALD/DOE. If PMP needed draft by October 2017 15. Clearly define scope, WBS dictionary, deliverables – October 2017 – not sure if all this is needed at this stage of the project, but can be done, further discussion with ALD/DOE 16. Evaluation and documentation of risks – October 2017
Maria, Grazyna, Bob, Xin, Jin and Ming
-- Ming Xiong Liu P-25, MS H846 TEL: 505-667-7125 Physics Division 631-344-7821(BNL) LANL 630-840-5708(FNAL) Los Alamos, NM 87545 FAX: 505-665-7020 |
- [Sphenix-physics-l] FW: MVTX workfest Dec. 5-7 @Santa Fe, Huang, Jin, 08/31/2017
Archive powered by MHonArc 2.6.24.