Subject: Commissioning and running of sPHENIX
List archive
- From: Stefan Bathe <stefan.bathe AT baruch.cuny.edu>
- To: sphenix-run-l AT lists.bnl.gov
- Subject: [Sphenix-run-l] Minutes shift change 2023-04-18
- Date: Tue, 18 Apr 2023 17:04:02 -0400
Minutes shift change 2023-04-18
general (Stefan)
-----------
- Carriage power and water shutdown Friday morning 7:00am - 11:30am
- If you do any work in the IR that might trigger alarms, please notify the shift leader in advance!
- computer usage: don’t put large files in home dir, which is backed-up. Talk to Martin if you need anything special.
evening: Oliver
- nothing
night: Charles
DAQ
- not eventful
- turned off EMCal digitizer racks for EMCal work (Joel)
- TPC cooling water/pressure gauges
- not properly connected
day: Sean
- busy day
- EMCal racks were off for most of the day for work
- now on, Tim doing testing
- Rob and Steve looked at GUIs and made list of things that needed to be fixed
- TPOT work
- INTT testing (Itaru)
- rack alarms due to work in IR
MBD (Mickey)
- students are working on cleaning up cables near rack; after that will test noise level again
HCal (Hanpu)
- one sector tripping, don’t know yet why
EMCal (Sean)
- ongoing work
- tracking down signal cable connections
TPOT (Hugo)
- turned on LV, played with FEE, took data, plugged in temporary LV cable, no showstoppers
- noise situation has improved by itself (other detectors’ cables shielding?)
TPC (Jin)
TPC (Jin)
- operating N with cooling on
- John was operating N last night
- Rob still running adjustment of cooling
- in coming days expect turn-over to shift crew
- for now LV under expert control unless alarm
INTT (Rachid earlier today)
- plan to install new q-pack for bias to get to nominal voltage
- interlock test postponed since bias was found to be not connected to interlocks yes
MVTX (Cameron)
MVTX (Cameron)
- DAQ1 chiller (turned off for several days b/c of abnormally high temps)
- still reading high temperatures => faulty component
- spare chiller will come online
- expect shift crew to monitor chiller soon
- system test started this morning by experts
- three problematic connections, investigating
sEPD (Hugo)
- light guides are being installed
DAQ
- see separate DAQ meeting after shift change
Magnet (Kin)
- He gas being purged
- eventual cool down takes 10 days
Gas/cooling water (Hugo)
- Rob is fixing some fittings on TPOT TPC cooling panels (leaks)
Plan of the day
- Rob is fixing some fittings on TPOT TPC cooling panels (leaks)
Plan of the day
- DAQ development
- subsystem testing
-
-
---------------------------------------------------------------------------------
Stefan Bathe
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist
Baruch: BNL:
17 Lexington Ave Bldg. 510
office 940 office 2-229
phone 646-660-6272 phone 631-344-8490
----------------------------------------------------------------------------------
Baruch College, CUNY
and RIKEN Visiting Scientist
Baruch: BNL:
17 Lexington Ave Bldg. 510
office 940 office 2-229
phone 646-660-6272 phone 631-344-8490
----------------------------------------------------------------------------------
- [Sphenix-run-l] Minutes shift change 2023-04-18, Stefan Bathe, 04/18/2023
Archive powered by MHonArc 2.6.24.