Skip to Content.
Sympa Menu

sphenix-run-l - [Sphenix-run-l] Minutes shift change 2023-04-20

sphenix-run-l AT lists.bnl.gov

Subject: Commissioning and running of sPHENIX

List archive

Chronological Thread  
  • From: Stefan Bathe <stefan.bathe AT baruch.cuny.edu>
  • To: sphenix-run-l AT lists.bnl.gov
  • Subject: [Sphenix-run-l] Minutes shift change 2023-04-20
  • Date: Thu, 20 Apr 2023 17:23:20 -0400

Minutes shift change 2023-04-20

general (Stefan)
-----------
- Reminder:  Rack power and ECW shutdown tomorrow morning
- ECW is back now after earlier failure
- Diving boards are back:  inform shift leader of any work in bore
- Reminder:  Shift Leader should be informed about subsystem work

evening:  Cameron
- first couple hours people working on systems
- 6:30 only north half of EMCa and HCal on (cosmics)
- work done on scaffolding
- after that barricaded off and swapped to next shift
- after that quiet
- one less mouse
- alarm panel read by CAD indicated water leak in bore
  - Lee:  bit error, fixed

night:  Charles
- uneventful
- same detectors on
- replaced barrier tag
- durachill reservoir level alarm (same as last night)

day:  Sean
- mostly uneventful for most of shift
- carpenter came late in day to restore diving board
- trip of main alarm panel that electrician was working on, disabled
- came back in faulty state that tripped ECW
- turned off all racks that need ECW
- at end of shift working on getting ECW back

MBD (Mickey)
- Steve, Rob:  work on interlocks, needed to tweak switches, done, Steve confirming, should be ready by tonight

HCal (Hanpu)
- still focusing on bias fluctuations in mpod, will run test during evening shift
- also cosmic test:  will need help from night shift to continue

EMCal (Sean)
- the usual daily work, Tim made progress plugging in cables, waiting for access to bore

TPOT (Hugo)
- couldn’t do much b/c of blocked access to both bores
- did some work at rack level
- cooling works now (no more modification)
- interlock:   TPOT interlocked by TPC (common cooling water flow)
- able to take PRDF data (Martin)

TPC (Thomas)
- cooling ready
- both N and S on for first time and T stable
- fibers connected
- checking read out chain
- taking pedestal data

INTT (Jaein)
- ROC out right now
- trying to fix

MVTX (Cameron)
- prepping replacement chiller last night
- but no techs available today to move onto platform, so probably tomorrow
- testing interlocks in 2E3, 2E3, turned off, shift crew aware
- after that will do system test by experts

sEPD (Rosi)
- all fiber optics here, North side will be installed once cable pullers available 
- light tighting for N disk done, will be brought here

DAQ
- see separate DAQ meeting after shift change

Magnet (Kin)
- nothing new

Gas/cooling water
- cooling water is essentially ready for operation
- gas:  waiting for IRR approval

Plan of the day
- DAQ development
- subsystem testing

---------------------------------------------------------------------------------
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist

Baruch:                                     BNL:
17 Lexington Ave                      Bldg. 510
office 940                                  office 2-229
phone 646-660-6272                phone 631-344-8490
----------------------------------------------------------------------------------



_______________________________________________
Sphenix-run-l mailing list
Sphenix-run-l AT lists.bnl.gov
https://urldefense.proofpoint.com/v2/url?u=https-3A__lists.bnl.gov_mailman_listinfo_sphenix-2Drun-2Dl&d=DwICAg&c=dTXc8cCP8suVpClwB1HRHQACHN4UFMgL7MtSjCbKyts&r=VpzLtnjcGB03vfJuG_p478bcDf7zDOFn2OeUM-jusdY&m=9i2YUqljNP55R0yvqQOFFqw5X4suIZ-Eznf5SUjAdUkpN_BBdCgXCLUC5q8_mzNg&s=vkUZrF0R06pA5k9fsSMKIYaP4pmmnx2n-x-FmlPL5Mw&e=

---------------------------------------------------------------------------------
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist

Baruch:                                     BNL:
17 Lexington Ave                      Bldg. 510
office 940                                  office 2-229
phone 646-660-6272                phone 631-344-8490
----------------------------------------------------------------------------------





  • [Sphenix-run-l] Minutes shift change 2023-04-20, Stefan Bathe, 04/20/2023

Archive powered by MHonArc 2.6.24.

Top of Page