sphenix-run-l AT lists.bnl.gov
Subject: Commissioning and running of sPHENIX
List archive
- From: Stefan Bathe <stefan.bathe AT baruch.cuny.edu>
- To: sphenix-run-l AT lists.bnl.gov
- Subject: [Sphenix-run-l] Minutes shift change 2023-05-17
- Date: Wed, 17 May 2023 17:17:35 -0400
Minutes shift change 2023-05-17
general
—————
first collisions in sPHENIX last night
- as seen on ZDC coincidence scaler (black line) in attached plot
- for detailed legend see John H’s elog entry
approval
evening (Sasha)
- quiet shift
Day (Ben)
TPC (Takao)
- John and Jin worked overnight, bandwidth wider, 224 samples can be read out
-
---------------------------------------------------------------------------------
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist
Baruch: BNL:
17 Lexington Ave Bldg. 510
office 940 office 2-229
phone 646-660-6272 phone 631-344-8490
----------------------------------------------------------------------------------
- last post start item inside IR was finished today
- still waiting for BHSO approval
new access-call list (linked from run web page)
- please enter your access requests
access:
- access is over
- no more scheduled access until June maintenance day
plan of the day
- get MBD-based LL1 trigger and time in MBD overnight
evening (Sasha)
- quiet shift
- lost restricted access early on
- sweep team found tools, retrieved
- there was ongoing work
- miscommunication between technicians, experiment, C-AD
- addressed today
- 5:00pm no access
- 10pm beam in both beams
- kept until the end of the shift
night (Brett)
- pretty quiet
- one HCal trip
- first collisions in sPHENIX
Day (Ben)
- a lot of access
- keeping track of who’s going in and coming out
MBD (Abdul)
- ready to time in
HCAL (Oliver
- one tripped channel last night
- 3rd trip since Monday
- today’s tripped channel included in both previous trips
- raised trip currents and current limits
- cause not know
EMCal (Sean)
- recovering channels by swapping cables
TPOT (Hugo)
- recovering channels by swapping cables
TPOT (Hugo)
- running with RCDAQ for five hours, stable
- wating for gas
TPC (Takao)
- John and Jin worked overnight, bandwidth wider, 224 samples can be read out
- now can read one full drift length
- yesterday’s mystery regarding switched off TPC/TPOT racks solved
- technician accidentally tripped breaker for 24 V PLC system
INTT (Rachid)
- big partition test tomorrow with Martin
- issue with too few events in online monitoring, investigating
- waiting for nitrogen for commissioning
MVTX (Cameron)
- decoder work with Martin and experts
- new line from remote IO system to read out mainframe
- will finish with another access
- Yasser: coordinate to check T with INTT
- Rachid: blower status?: Chris will talk to Rob Pisani
sEPD nothing
DAQ (Martin)
DAQ (Martin)
- last night finished work on GL1 read-out
- new machine in place
- decoder in place
- will be run with everything else tonight
Trigger (Dan)
- MBD ADC firmware has been updated for timing and charge channels
- MBD ADC firmware has been updated for timing and charge channels
- upcoming dry run for LL1 and GL1 so we can work on timing in MBD and MBD trigger so be ready ready for beam
ZDC (John)
ZDC (John)
- ZDC worked last night
- plan to look at analog signals
-
---------------------------------------------------------------------------------
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist
Baruch: BNL:
17 Lexington Ave Bldg. 510
office 940 office 2-229
phone 646-660-6272 phone 631-344-8490
----------------------------------------------------------------------------------
- [Sphenix-run-l] Minutes shift change 2023-05-17, Stefan Bathe, 05/17/2023
Archive powered by MHonArc 2.6.24.