Skip to Content.
Sympa Menu

sphenix-run-l - [Sphenix-run-l] Notes from the 9 o'clock meeting/scheduling meeting (6/20)

sphenix-run-l AT lists.bnl.gov

Subject: Commissioning and running of sPHENIX

List archive

Chronological Thread  
  • From: Stefan Bathe <stefan.bathe AT baruch.cuny.edu>
  • To: sphenix-run-l AT lists.bnl.gov
  • Subject: [Sphenix-run-l] Notes from the 9 o'clock meeting/scheduling meeting (6/20)
  • Date: Tue, 20 Jun 2023 09:46:38 -0400

RHIC (see attached slides)
- vacuum issues at IP12, maybe able to wait until maintenance day
- STAR/sPHENIX blue backgrounds
  - Th 8:00am test of 12x12 store for 1 h:  add a bump and see if it goes away
  - we then should monitor background counters 
- Vernier scan
  - preliminary:  6.5 barn (instead of 6)



STAR
- magnet chiller still has issue that requires future maintenance (waiting for extended downtime)
  - but magnet is up for now

sPHENIX (see linked slides)
- crossing angle
  - ZDC rate is low b/c of satellite bunches
  - 56 MHz cavity will help eventually





Screenshot 2023-06-20 at 09.02.32.pngScreenshot 2023-06-20 at 08.59.38.png
---------------------------------------------------------------------------------
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist

Baruch:                                     BNL:
17 Lexington Ave                      Bldg. 510
office 940                                  office 2-229
phone 646-660-6272                phone 631-344-8490
----------------------------------------------------------------------------------





  • [Sphenix-run-l] Notes from the 9 o'clock meeting/scheduling meeting (6/20), Stefan Bathe, 06/20/2023

Archive powered by MHonArc 2.6.24.

Top of Page