sphenix-run-l AT lists.bnl.gov
Subject: Commissioning and running of sPHENIX
List archive
[Sphenix-run-l] Notes from the 9 o'clock meeting/scheduling meeting (6/20)
- From: Stefan Bathe <stefan.bathe AT baruch.cuny.edu>
- To: sphenix-run-l AT lists.bnl.gov
- Subject: [Sphenix-run-l] Notes from the 9 o'clock meeting/scheduling meeting (6/20)
- Date: Tue, 20 Jun 2023 09:46:38 -0400
RHIC (see attached slides)
- vacuum issues at IP12, maybe able to wait until maintenance day
- STAR/sPHENIX blue backgrounds
- Th 8:00am test of 12x12 store for 1 h: add a bump and see if it goes away
- we then should monitor background counters
- Vernier scan
- preliminary: 6.5 barn (instead of 6)
STAR
- magnet chiller still has issue that requires future maintenance (waiting for extended downtime)
- but magnet is up for now
sPHENIX (see linked slides)
- crossing angle
- ZDC rate is low b/c of satellite bunches
- 56 MHz cavity will help eventually
-
---------------------------------------------------------------------------------
Stefan Bathe
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist
Baruch: BNL:
17 Lexington Ave Bldg. 510
office 940 office 2-229
phone 646-660-6272 phone 631-344-8490
----------------------------------------------------------------------------------
Baruch College, CUNY
and RIKEN Visiting Scientist
Baruch: BNL:
17 Lexington Ave Bldg. 510
office 940 office 2-229
phone 646-660-6272 phone 631-344-8490
----------------------------------------------------------------------------------
- [Sphenix-run-l] Notes from the 9 o'clock meeting/scheduling meeting (6/20), Stefan Bathe, 06/20/2023
Archive powered by MHonArc 2.6.24.