sphenix-run-l AT lists.bnl.gov
Subject: Commissioning and running of sPHENIX
List archive
[Sphenix-run-l] notes from 9 o'clock meeting (6/30)
- From: Stefan Bathe <stefan.bathe AT baruch.cuny.edu>
- To: sphenix-run-l AT lists.bnl.gov
- Subject: [Sphenix-run-l] notes from 9 o'clock meeting (6/30)
- Date: Fri, 30 Jun 2023 21:25:57 -0400
RHIC (see attached slides)
- higher losses during ramp and transition since 6/23
- leading to beam aborts (by now we’ve had three or so)
- situation is degrading
- investigating
- might be equipment damage
- no concern for our detectors
- yesterday’s 12x12 test with bump to eliminate STAR backgrounds
- bump eliminated asymmetric background
- this apparently shows background is caused by Au78
- STAR background looks clean now
- unfortunately this bump is only suitable for a test
- trying to figure out how to get rid of Au78 in regular running
STAR
- very happy about result from background test
sPHENIX (see linked slides)
-
---------------------------------------------------------------------------------
Stefan Bathe
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist
Baruch: BNL:
17 Lexington Ave Bldg. 510
office 940 office 2-229
phone 646-660-6272 phone 631-344-8490
----------------------------------------------------------------------------------
Baruch College, CUNY
and RIKEN Visiting Scientist
Baruch: BNL:
17 Lexington Ave Bldg. 510
office 940 office 2-229
phone 646-660-6272 phone 631-344-8490
----------------------------------------------------------------------------------
- [Sphenix-run-l] notes from 9 o'clock meeting (6/30), Stefan Bathe, 06/30/2023
Archive powered by MHonArc 2.6.24.