sphenix-run-l AT lists.bnl.gov
Subject: Commissioning and running of sPHENIX
List archive
Re: [Sphenix-run-l] [EXTERNAL] Beam Spot and sPHENIX/INTT Geometry
- From: "Shi, Zhaozhong" <zhaozhongshi AT lanl.gov>
- To: nouicer <rachid.nouicer AT bnl.gov>, "sphenix-tracking-l AT lists.bnl.gov" <sphenix-tracking-l AT lists.bnl.gov>, "sphenix-run-l AT lists.bnl.gov" <sphenix-run-l AT lists.bnl.gov>, "sphenix-intt-l AT lists.bnl.gov" <sphenix-intt-l AT lists.bnl.gov>
- Subject: Re: [Sphenix-run-l] [EXTERNAL] Beam Spot and sPHENIX/INTT Geometry
- Date: Tue, 18 Jul 2023 01:29:23 +0000
We can have a look at a good event in a similar run with MVTX if possible.
Zhaozhong Shi, PhD
Director's Postdoctoral Fellow
P-3: Nuclear and Particle Physics and Application
Los Alamos National Laboratory
TA-53 Building 1 A106
Los Alamos, New Mexico 87545
Sent: Monday, July 17, 2023 5:38:43 PM
To: sphenix-tracking-l AT lists.bnl.gov; sphenix-run-l AT lists.bnl.gov; sphenix-intt-l AT lists.bnl.gov
Subject: [EXTERNAL] [Sphenix-run-l] Beam Spot and sPHENIX/INTT Geometry
Dear Joseph and Tony,
Please see the attached plots which correspond to the RHIC beam spot in X, Y directions obtained by the INTT detector using beam data with magnet-OFF run =20869 taken on 08 July 2023.
We observe that the beam spot coordinates is (0 mm, 5 mm); this means the beam spot is shifted by five mm in Y direction.
Before Stefan shows this plot to CAD, we need to understand is this shift by five mm is due to the beam shift itself, or it is caused by the INTT detector geometry (not fully implemented in our software).
I already provided you with the INTT local survey data (obtained at the lab for each ladder) as well with INTT Global survey data (obtained at the sPHENIXPHENIX IR). Are these survey data implemented in the present sPHENIX/INTT detector geometry that we are
using in our analysis or not?
We would highly appreciated your feedback.
Sincerely,
Rachid
for the INTT Group
-- - /_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/ / / Rachid Nouicer / / Brookhaven National Laboratory / / / / Address: / / Brookhaven National Laboratory (BNL) / / Physics Department, Building 510c / / 20 Pennsylvania Avenue / / Upton, New York, 11973, U.S.A. /Phone:+1 631 344 8433/ / / E-mail : rachid.nouicer AT bnl.gov / Fax:+1 631 344 3253 / Web:http://www4.rcf.bnl.gov/~nouicer / / / / /_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/
-
[Sphenix-run-l] Beam Spot and sPHENIX/INTT Geometry,
nouicer, 07/17/2023
-
Re: [Sphenix-run-l] Beam Spot and sPHENIX/INTT Geometry,
Liu, Ming Xiong, 07/17/2023
-
Re: [Sphenix-run-l] [Sphenix-maps-l] Beam Spot and sPHENIX/INTT Geometry,
Anthony Frawley, 07/17/2023
- [Sphenix-run-l] Fw: [Sphenix-maps-l] Beam Spot and sPHENIX/INTT Geometry, Anthony Frawley, 07/17/2023
- Re: [Sphenix-run-l] Beam Spot and sPHENIX/INTT Geometry, Sondheim, Walter E, 07/17/2023
-
Re: [Sphenix-run-l] [Sphenix-maps-l] Beam Spot and sPHENIX/INTT Geometry,
Anthony Frawley, 07/17/2023
- Re: [Sphenix-run-l] [EXTERNAL] Beam Spot and sPHENIX/INTT Geometry, Shi, Zhaozhong, 07/17/2023
-
Re: [Sphenix-run-l] [Sphenix-intt-l] Beam Spot and sPHENIX/INTT Geometry,
Bertaux, Joseph Tyler, 07/17/2023
- Re: [Sphenix-run-l] [Sphenix-intt-l] Beam Spot and sPHENIX/INTT Geometry, Hugo Pereira Da Costa, 07/18/2023
-
Message not available
- Re: [Sphenix-run-l] [PROVENANCE INTERNET] Re: [Sphenix-intt-l] Beam Spot and sPHENIX/INTT Geometry, Hugo Pereira Da Costa, 07/18/2023
- Re: [Sphenix-run-l] [Sphenix-intt-l] Beam Spot and sPHENIX/INTT Geometry, nouicer, 07/18/2023
-
Re: [Sphenix-run-l] Beam Spot and sPHENIX/INTT Geometry,
Liu, Ming Xiong, 07/17/2023
Archive powered by MHonArc 2.6.24.