Skip to Content.
Sympa Menu

sphenix-run-l - Re: [Sphenix-run-l] [Sphenix-l] "White smoke" (TPC test succeeded) → prep. for the South starts tomorrow

sphenix-run-l AT lists.bnl.gov

Subject: Commissioning and running of sPHENIX

List archive

Chronological Thread  
  • From: "Gunther M Roland" <rolandg AT mit.edu>
  • To: "Yip, Kin" <kinyip AT bnl.gov>
  • Cc: "sphenix-l AT lists.bnl.gov" <sphenix-l AT lists.bnl.gov>, "sphenix-run-l AT lists.bnl.gov" <sphenix-run-l AT lists.bnl.gov>
  • Subject: Re: [Sphenix-run-l] [Sphenix-l] "White smoke" (TPC test succeeded) → prep. for the South starts tomorrow
  • Date: Wed, 22 Nov 2023 03:07:25 +0000

Congratulations! That is excellent news and a great start on the path to Run
24.

Gunther


> On Nov 21, 2023, at 7:43 PM, Yip, Kin via sPHENIX-l
> <sphenix-l AT lists.bnl.gov> wrote:
>
> Hello,
>
> Thia evening, I can cheerfully report that the long-awaited "white smoke"
> has materialized (after preparing for two full days .... Well, we started
> turning on normal flow for TPC gas last Thursday).
>
> This afternoon/evening, I spent some time in 1008 room observing the TPC
> group (Tom, Charles, Evgeny and Luke) , John H., Martin, and Dan Cacace,
> completing the TPC test successfully.
>
> Under Tom's and John's leadership, we have tried to do the most
> comprehensive TPC test (using the CAEN power supply and the long bundle of
> cables) that we can do in a very timely manner. At the end of the test, we
> saw tracks successfully in the two sectors (611 & 612) in the North side of
> TPC in which we have installed the new equipment (along with other
> sectors). One of these two sectors was pathologically bad before the
> repair/upgrade whereas the other sector had no defect.
>
> We have demanded this test to convince ourselves that the TPC
> repair/upgrade scheme works and so we can start to prepare for the same TPC
> repair/upgrade for the entire TPC including both the North and South sides).
>
> Now, we have reached this point and we will start to prepare for the South
> tomorrow (Nov. 22), which would (at some point soon) include taking out the
> MVTX.
>
>
> Kin Yip
>
>
> PS:
>
> During the few hours in 1008, I also copied the "2023" files to the "2024"
> directory and we now have the "2024 run page" :
> https://sphenix-intra.sdcc.bnl.gov/WWW/run/2024/
>
> Of course, I have changed only the "2023" to "2024" and the name of Run
> Coordinator on the above page. Everything else has to be updated ...😅
> _______________________________________________
> sPHENIX-l mailing list
> sPHENIX-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/sphenix-l




Archive powered by MHonArc 2.6.24.

Top of Page