sphenix-run-l AT lists.bnl.gov
Subject: Commissioning and running of sPHENIX
List archive
- From: "Yip, Kin" <kinyip AT bnl.gov>
- To: "sphenix-run-l AT lists.bnl.gov" <sphenix-run-l AT lists.bnl.gov>
- Cc: "Robert-Demolaize, Guillaume" <grd AT bnl.gov>
- Subject: [Sphenix-run-l] RHIC parameters for Run24
- Date: Tue, 12 Dec 2023 21:03:08 +0000
Hello,
Kiel Hock (the RHIC Run Coordinator for 2024) and Guillaume Robert-Demolaize (lattice specialist in C-AD) have been working with beta*=50 cm at IP8 for a month, to the maturity that they think we can use this configuration (for the coming p-p collisions).
Compared to the nominal beta*=85 cm, this will get us higher luminosity in general and also higher % of luminosity within vertex +/- 10 cm. I include two plots that Kiel has sent me, LumiComp_8550.pdf and CollComp_8550.pdf.
The possible downside is that the beta-function in triplets (Q1/2/3) will increase which will generate more scrapping=>backgrounds, giving rise to more background at IP8. Angelika Drees (C-AD) – the person who does the collimation --- just confirmed with me about this worry. She actually reminded me that on Aug. 1, 2023, we actually tried to increase the beta* to 5 m (500 cm) --- an experiment --- in order to decrease the background.
Kiel’s good intention is to try to get us to 75/pb quicker (to achieve our luminosity goal). I talked with him a few more times today. The obvious thing to do is to start with beta* = 85 cm first and see what we get, and then try beta* = 50 cm to see how bad the background is by comparison.
Maybe, some of us can discuss this in the Operations Board Meeting this Friday.
Below is the email that he sent today and if you can’t see https://www.cadops.bnl.gov/AP/Spin2024/ , I have saved it as PDF: “RHIC Run-24.pdf”. ( The important parts should be the beta* and crossing angle. )
Kin
From: Hock, Kiel <khock AT bnl.gov>
Hi Kin and JH,
I have the main IR parameters summarized here:https://www.cadops.bnl.gov/AP/Spin2024/ and wanted to confirm them for our lattice designer: STAR would like to remain at 85 cm and a 0 mrad crossing angle. sPHENIX would like a smaller beta* (currently shooting for 50 cm) and a 2 mrad crossing angle.
Thanks,
Kiel |
Attachment:
LumiComp_8550.pdf
Description: LumiComp_8550.pdf
Attachment:
CollComp_8550.pdf
Description: CollComp_8550.pdf
Attachment:
RHIC Run-24.pdf
Description: RHIC Run-24.pdf
-
[Sphenix-run-l] RHIC parameters for Run24,
Yip, Kin, 12/12/2023
-
Re: [Sphenix-run-l] RHIC parameters for Run24,
Perepelitsa, Dennis, 12/12/2023
-
Re: [Sphenix-run-l] RHIC parameters for Run24,
Itaru Nakagawa, 12/12/2023
-
Re: [Sphenix-run-l] RHIC parameters for Run24,
Yip, Kin, 12/12/2023
- Re: [Sphenix-run-l] RHIC parameters for Run24, Itaru Nakagawa, 12/12/2023
-
Re: [Sphenix-run-l] RHIC parameters for Run24,
Yip, Kin, 12/12/2023
- Re: [Sphenix-run-l] RHIC parameters for Run24, Yip, Kin, 12/12/2023
-
Re: [Sphenix-run-l] RHIC parameters for Run24,
Itaru Nakagawa, 12/12/2023
-
Re: [Sphenix-run-l] RHIC parameters for Run24,
Perepelitsa, Dennis, 12/12/2023
Archive powered by MHonArc 2.6.24.