Skip to Content.
Sympa Menu

sphenix-run-l - [Sphenix-run-l] Access Controls testing around IR8 (wings ...) + Accumulating Snow Expected Friday, 1/19

sphenix-run-l AT lists.bnl.gov

Subject: Commissioning and running of sPHENIX

List archive

Chronological Thread  
  • From: "Yip, Kin" <kinyip AT bnl.gov>
  • To: "sphenix-run-l AT lists.bnl.gov" <sphenix-run-l AT lists.bnl.gov>
  • Subject: [Sphenix-run-l] Access Controls testing around IR8 (wings ...) + Accumulating Snow Expected Friday, 1/19
  • Date: Thu, 18 Jan 2024 21:01:43 +0000

Below are two messages, one about Access Control tests in 1008 this weekend  and the other one about the snow tomorrow 😊

 

From: Carroll, Daniel <dcarroll AT bnl.gov>
Sent: Thursday, January 18, 2024 3:15 PM
To: Hillis, Darren <dhillis AT bnl.gov>; Sampson, Paul <sampson AT bnl.gov>; Marr, Gregory <gmarr AT bnl.gov>; Shrey, Travis C <shrey AT bnl.gov>
Cc: Reich, Jonathan <reich AT bnl.gov>; Giorgio, Caitlin <charper AT bnl.gov>; Fliller, Raymond <rfliller AT bnl.gov>; Craner, Francis <fcraner AT bnl.gov>; Giorgio, Caitlin <charper AT bnl.gov>; Benante, John T <benante AT bnl.gov>; Reich, Jonathan <reich AT bnl.gov>; Vasquez, Joel <jvasquez AT bnl.gov>; Albanese, Marianna <malbanese AT bnl.gov>; Lorio, Matthew <mlorio AT bnl.gov>; Yip, Kin <kinyip AT bnl.gov>; Franco, Anthony <afranco AT bnl.gov>; Scheifele, Frank <scheifele AT bnl.gov>; Lamar, Walter K <lamar AT bnl.gov>; O'Neill, Terrence <toneill AT bnl.gov>
Subject: RE: Access Controls Work in ODH Service Buildings - 1002B, 1004B, 1006B, 1008B, 1010A and 1012A.

 

This weekend, Saturday and Sunday mornings from 7:00am until noon, Access Controls will begin annual recertification of our systems at 8:oo (sPHENIX region). Most work on these days will take place in the “wings”, 7Z1 and 8Z2, but there may also be work performed in the IR, 8Z1.

 

Be aware that we will be going through ALL modes during certification, including NO ACCESS mode 24, which WILL cause beam imminent alarms (lights and horns) to be activated intermittently across the entire sector, all three zones.

 

We do not anticipate performing any ODH testing this weekend, but the possibility always exists that ODH alarms may be activated while testing.

 

Dan Carroll

Brookhaven National Laboratory

Collider Accelerator Dep’t

Access Controls Group

Upton, NY 11973

631 344-4230

dcarroll AT bnl.gov

 

 

 

 

 

-----Original Message-----
From: Broadcast-l broadcast-l-bounces AT lists.bnl.gov On Behalf Of BNL Media & Communications Office
Sent: Thursday, January 18, 2024 3:35 PM
To: BROADCAST-L broadcast-l AT lists.bnl.gov
Subject: Accumulating Snow Expected Friday, 1/19 – Watch for Slippery Conditions On Site

 

NOTE: This message is being sent to the Lab community on behalf of the Office of Emergency Management. Note to supervisors: Please share this message with members of your staff who don't have regular access to email.

 

* * *

 

Accumulating Snow Expected Friday, 1/19 – Watch for Slippery Conditions On Site

 

The National Weather Service has issued a Winter Weather Advisory for all of Long Island from 9 a.m. until 9 p.m. on Friday, Jan. 19, with snow expected to fall throughout the day. Two to three inches of snow accumulation is forecast for the Lab site at this time. Following the storm, temperatures will remain below freezing with wind chills in the single digits for Saturday into Sunday.

 

You should expect slippery conditions across the site. Wear proper footwear, watch for slippery areas, drive carefully, remove snow accumulation from your vehicle before driving, be aware of your surroundings, and avoid potential hazards when walking and driving. Use extra caution when exiting your vehicle as parking lots may be slippery.

 

Ice melt is available in buckets at building entrances and may be used by anyone. If an unsafe condition has potential to cause an immediate danger to anyone on site, call Ext. 2222. From a cell phone, dial 631-344-2222. If you see something unsafe relating to your facility or building that is not an emergency, contact the Facility Operations Center at Ext. 2468.

 

If there are any changes to the Lab's operating status due to weather, a message will be sent to all staff via broadcast email, the Everbridge notification system, and posted to the external home page at http://www.bnl.gov. You can also check the INFO line (631 344-INFO) for the Lab's current operating status.

 

Information about the Laboratory's processes for closing and reopening the site can be found at https://www.bnl.gov/newsroom/news.php?a=221650 (VPN may be required).

 

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

  Brookhaven National Laboratory                www.bnl.gov

  Media & Communications Office        Phone: (631)344-3174

  Bldg. 400 - P.O. Box 5000              Fax: (631)344-3368

  Upton, NY 11973

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

 

 

_______________________________________________

Broadcast-l mailing list

Broadcast-l AT lists.bnl.gov

https://lists.bnl.gov/mailman/listinfo/broadcast-l

 



  • [Sphenix-run-l] Access Controls testing around IR8 (wings ...) + Accumulating Snow Expected Friday, 1/19, Yip, Kin, 01/18/2024

Archive powered by MHonArc 2.6.24.

Top of Page