Hello,

 

C-AD Access Group will do ODH calibration in 1008 IR and Assembly Hall between 7 – 9 am tomorrow (Jan. 7).  Nobody should be in 1008 IR and Assembly Hall during this time.

( In reality, not many people will be around between 7 am – 9 am anyway 😊 )   If they can’t finish, they’ll do the same on Jan. 8.

 

Kin

 

From: Hillis, Darren <dhillis AT bnl.gov>
Sent: Monday, January 6, 2025 9:58 AM
To: Yip, Kin <kinyip AT bnl.gov>; Toldo, Frank A <fatoldo AT bnl.gov>; Albanese, Marianna <malbanese AT bnl.gov>; Vasquez, Joel <jvasquez AT bnl.gov>
Cc: Reich, Jonathan <reich AT bnl.gov>; Access Controls Group <accesscontrols AT bnl.gov>; Sampson, Paul <sampson AT bnl.gov>; Craner, Francis <fcraner AT bnl.gov>
Subject: Calibration 1008IR ODH Sensors

 

 

All,

 

We are initially scheduled  for this Calibration 1008IR ODH Sensors tomorrow morning 1/7/2025 from 7:00AM to 9:00AM.

 

This calibration would sound/flash alarms in the 1008IR and Assembly Hall, and are requesting where only Access Controls Personnel would be in the 1008IR and Assembly Hall during this testing. 

 

Access Controls would call the BNL Fire Group to notify them about sounding alarms at 1008 during the testing.  Access Controls would call the BNL Fire Group to notify them,  when testing is complete.  

 

Once the test time slot(s) is approved and authorized, the following will be called and emailed, before the start of the test, each day, to let everyone know about this testing:

             Notify sPHENIX Control Room Shift Supervisor at x7815

Notify 911MCR Control Room Personnel at x4662

Notify CAS Support at x2024

Notify Kin Yip @ x 4116

Notify Frank Toldo @ x7788

Notify Marianna Albanese @ x3839

      BNL Fire Group

 

Note: The Certification Testing in 1008IR would take place at  later time and would have the same requirements.

 

Thanks,

 

Darren Hillis

 

Access Controls Group

Collider-Accelerator Department

Brookhaven National Laboratory

Upton, NY 11973 USA

W(631)344-5849

Cell(631)742-5081

dhillis AT bnl.gov

 



  • [[Sphenix-run-l] ] FW: Calibration 1008IR ODH Sensors (tomorrow morning), Yip, Kin, 01/06/2025

Archive powered by MHonArc 2.6.24.

Top of Page