- From: Micah Meskowitz <mim219 AT lehigh.edu>
- To: sphenix-sepd-l AT lists.bnl.gov
- Subject: [sphenix-sepd-l] Strongback Assembly Progress
- Date: Thu, 16 Mar 2023 16:55:32 -0400
Hi all,
Today the strongback sector frames were delivered to highbay. Jaebom and I checked both that each individual sector was flat and that each six sector frames fit together on the optical table that was cleared off for us. No noticeable warping or other indication we would need a replacement or modification to them was found.
Before we assemble a sector, we need one piece from the Xometry order. The splice plate was delivered to BNL Monday morning, but has not yet been brought to the highbay. After it has been brought to the highbay, we can have a tech assigned, assemble one strongback petal and test that the sEPD sectors will fit into the assembled petal, or if any need to be rewrapped. Soon after, when the petal carrier is assembled, we can put together the rest of the petals.
Best,
Micah Meskowitz
-
[sphenix-sepd-l] Strongback Assembly Progress,
Micah Meskowitz, 03/16/2023
- Re: [sphenix-sepd-l] Strongback Assembly Progress, Micah Meskowitz, 03/16/2023
-
Re: [sphenix-sepd-l] Strongback Assembly Progress,
Rosi Reed, 03/16/2023
-
Re: [sphenix-sepd-l] Strongback Assembly Progress,
Micah Meskowitz, 03/16/2023
-
Re: [sphenix-sepd-l] Strongback Assembly Progress,
Park, JaeBeom, 03/16/2023
- Re: [sphenix-sepd-l] Strongback Assembly Progress, Micah Meskowitz, 03/17/2023
-
Re: [sphenix-sepd-l] Strongback Assembly Progress,
Park, JaeBeom, 03/16/2023
- Re: [sphenix-sepd-l] Strongback Assembly Progress, Park, JaeBeom, 03/16/2023
-
Re: [sphenix-sepd-l] Strongback Assembly Progress,
Micah Meskowitz, 03/16/2023