sphenix-sepd-l AT lists.bnl.gov
Subject: sPHENIX Event Plane Detector discussion
List archive
- From: Eric Mannel <mannel AT bnl.gov>
- To: sphenix-sepd-l AT lists.bnl.gov
- Subject: Re: [sphenix-sepd-l] First "beam" mip peaks
- Date: Thu, 20 Jul 2023 08:54:06 -0400
Rosi-
This is impressive for first day data.
My suggestion is that the bias voltage be set at the nominal
operating voltage for your SiPMs (60V? including offsets) and
continue to get some data. It would be good to compare the
waveforms for the channels that have the correct Meritec cable
(100 Ohm impedance matched) and the Meritec cables that have hook
up wire to see if there is any difference and if we can proceed
with building up the 2 boxes over the next 2 weeks and have at
least one of them ready for installation next access day.
Eric
--
RHIC/AGS UEC member
Associate Professor, Physics Department
Lehigh University
(610)758-3907
16 Memorial Drive East Office 406
Bethlehem, PA 18015
she/her/hers
_______________________________________________ sPHENIX-sEPD-l mailing list sPHENIX-sEPD-l AT lists.bnl.gov https://lists.bnl.gov/mailman/listinfo/sphenix-sepd-l
-- Eric J. Mannel, Ph.D. Research Engineer Dept of Physics/PHENIX Brookhaven National Laboratory 631/344-7626 (Office) 914/659-3235 (cell)
-
[sphenix-sepd-l] First "beam" mip peaks,
Rosi Reed, 07/20/2023
- Re: [sphenix-sepd-l] First "beam" mip peaks, Eric Mannel, 07/20/2023
Archive powered by MHonArc 2.6.24.