sphenix-software-l - Re: [Sphenix-software-l] [Sphenix-l] [minutes] sPHENIX simulation meetings, Tue Aug 4th 1-3PM @ 2-187

sphenix-software-l AT lists.bnl.gov

Subject: sPHENIX discussion of software

List archive

Chronological Thread  
  • From: "Huang, Jin" <jhuang AT bnl.gov>
  • To: "sphenix-software-l AT lists.bnl.gov" <sphenix-software-l AT lists.bnl.gov>
  • Subject: Re: [Sphenix-software-l] [Sphenix-l] [minutes] sPHENIX simulation meetings, Tue Aug 4th 1-3PM @ 2-187
  • Date: Tue, 4 Aug 2015 21:41:23 +0000

Dear All

 

This is to confirm the outer HCal field after-burner was merged to sPHENIX master branch and will be activated in the next build:

https://github.com/sPHENIX-Collaboration/coresoftware/pull/13

 

Cheers

 

Jin

 

______________________________

 

Jin HUANG

 

Brookhaven National Laboratory

Physics Department, Bldg 510 C

Upton, NY 11973-5000

 

Office: 631-344-5898

Cell:   757-604-9946

______________________________

 

From: sphenix-l-bounces AT lists.bnl.gov [mailto:sphenix-l-bounces AT lists.bnl.gov] On Behalf Of Huang, Jin
Sent: Tuesday, August 4, 2015 4:59 PM
To: sphenix-l AT lists.bnl.gov; sphenix-software-l AT lists.bnl.gov
Subject: [Sphenix-l] [minutes] sPHENIX simulation meetings, Tue Aug 4th 1-3PM @ 2-187

 

Also available on agenda: https://indico.bnl.gov/conferenceDisplay.py?confId=1185

 

Announcement:

 

A pre-CDR document is planned for the coming BNL Cost and Schedule review. More detail will be discussed in the coming Thu sPHENIX meeting. Please call into that meeting for the pre-CDR information.

 

Following the call for pre-CDR, we are also planning for simulation code freeze (soon-ish?) -> simulation production (Aug?) -> analysis tool freeze (early Sept?) -> producing plots (Sept?). Details are still being determined. We plan to have a discussion on this plan in the next simulation meeting too.

 

 

Dave, Martin - sPHENIX computing distribution via VM

 

Dave/Page 4: Concept introduction

John Lajoie: modern VM are very efficient (with cost of few %)

Dave: may depending on operation, which leads to optimization of the sPHENIX VM system design

Abhisek: similar experience on ORNL super computer supports such direction too.

Chris: RCF is also looking into the use of Docker Engine too

 

Dave/Page 5: File system considerations.

Martin: frequency of update will affect the choice.

Jin: would we gain control of the CVM-FS write permission (rather than going through FNAL right now for CVM-FS)?

Dave: need to be investigated.

 

Dave/Page 6/7: VM VS Docker

John L. : another option would be use a VM disk for distribution.

 

Dave/Discussion:

Tony: how condor (or in general batch) job would run?

Dave: we expect a similar way in running it.

 

Martin/Page 7:

VMWare: the cost would be low for academia use (like us)

 

Martin/demonstration of running sPHENIX over VMWare:

Jin: Shall we standardize the update macro?

Martin: testing VirtualBox before define a releasing

 

John L.: we shall explore distributing with virtual disks. Update: a new thread started in the software-l regarding this topic.

Martin: to be explored

 

Chris: the goal would be for people use in laptop quick test. Farm need different strategy.

 

 

Jin: Geant4 after-burner to model 3D magnetic field in outer HCal

 

Achim: a full 3D model calculation on the Hcal field is also produced by Walter Sondheim (LANL), which we can use for cross check. Slides added to the agenda.

Action Item [Jin & Achim]: cross check the modeled 3D field map with 3D calculated field from Walter .

 

Conclusion: minor change in Hcal response observed. No objection raised regarding using the after-burner in HCAL simulation until the full 3D map can be imported.

 

 

Eliton - Shower G4 parameter tuning

 

Page3:

Jin: Production threshold control the secondary particle production, rather than the primary one.

 

Conclusion 1:

Current check did not show strong dependence of shower response in SPACAL. Still need to check shower RMS.

Action Item [Eliton] : threshold dependency of electron energy resolution

 

Part2:

Conclusion 2:

Checked the average step length for muon in large block is ~ a few cm.

 

 

Chris - pCDR simulation preparation

 

Changing forward of PHG4Hit

 

Jin: Can we just increase ROOT version ID by 1?

Chris: did NOT work last time.

 

Action Item [Chris]: After update the software, redo test production sample we used in SBU workfest. Notify the list

Action Item [Alan]: fixing into the irreproducibility issue in vertex finder. Update: Alan committed fix after the meeting already. Chris started the rebuild with this fix.

 

 

______________________________

 

Jin HUANG

 

Brookhaven National Laboratory

Physics Department, Bldg 510 C

Upton, NY 11973-5000

 

Office: 631-344-5898

Cell:   757-604-9946

______________________________

 

From: sphenix-l-bounces AT lists.bnl.gov [mailto:sphenix-l-bounces AT lists.bnl.gov] On Behalf Of Huang, Jin
Sent: Monday, August 3, 2015 2:56 PM
To: sphenix-l AT lists.bnl.gov; sphenix-software-l AT lists.bnl.gov
Subject: [Sphenix-l] [reminder] sPHENIX simulation meetings, Tue Aug 4th 1-3PM @ 2-187

 

Dear All,

 

This is reminder of our weekly sPHENIX simulation meeting Tue Aug 4th 1-3PM. For residents at BNL, we will meet in the 2-187 conference room (for this week and next only).

 

Continuing the discussions from the last sPHENIX workfest at SBU, we will start this meeting with PHENIX software environment over VM, as well as update to the HCal magnetic field map. More updates are welcomed too.

 

The agenda page is at https://indico.bnl.gov/conferenceDisplay.py?confId=1185 , for which the modification password is 1008

 

To join via Browser:

https://bluejeans.com/377457648/browser

 

To join via Phone:

1) Dial:

+1 408 740 7256

+1 888 240 2560(US Toll Free)

+1 408 317 9253(Alternate Number)

(see all numbers - http://bluejeans.com/numbers)

2) Enter Conference ID: 377457648

 

 

Cheers,

 

Jin

 

 

______________________________

 

Jin HUANG

 

Brookhaven National Laboratory

Physics Department, Bldg 510 C

Upton, NY 11973-5000

 