sphenix-tpc-l AT lists.bnl.gov
Subject: Sphenix-tpc-l mailing list
List archive
[Sphenix-tpc-l] CRITICAL--Please Read. sPHENIX TPC Module Production.
- From: Thomas K Hemmick <hemmick AT skipper.physics.sunysb.edu>
- To: sphenix-tpc-l AT lists.bnl.gov, Stonybrook TPC group <sbu_tpc AT skipper.physics.sunysb.edu>, Bernd Surrow <surrow AT temple.edu>, Matt Posik <mposik1983 AT gmail.com>, "Victor Riabov (Ryabov)" <riabovvg AT rcf2.rhic.bnl.gov>, Vicki Greene <senta.v.greene AT vanderbilt.edu>, Julia Velkovska <julia.velkovska AT vanderbilt.edu>, "Tarafdar, Sourav" <sourav.tarafdar AT vanderbilt.edu>, Sasha Milov <alexander.milov AT weizmann.ac.il>, Vladimir Peskov <vladimir.peskov AT cern.ch>, Khanzadeev Alexei <khanzade AT mail.pnpi.spb.ru>, Lior Arazi <lior.arazi AT weizmann.ac.il>, Bob Azmoun <azmoun AT bnl.gov>, woody <Woody AT bnl.gov>, William Llope <wjllope AT wayne.edu>, Joern Putschke <joern.putschke AT wayne.edu>
- Subject: [Sphenix-tpc-l] CRITICAL--Please Read. sPHENIX TPC Module Production.
- Date: Thu, 2 Nov 2017 14:54:47 -0400
Hi Everyone
We have reached the stage in the TPC where module production (we won't do much physics with only a field cage) needs to be seriously addressed. As you are aware, the FY18 efforts require a serious ramp-up of efforts in this area and include both the preparation (missing parts) and validation (module production example) steps for all our factories.
The WBS says that we shall have three factories (PNPI, WIS, Vanderbilt) each of which produces all modules of a single size. Since the time of the writing of that WBS, we have enjoyed attracting interest from additional institutions with significant expertise and experience (Temple, Wayne State, ...). Now as OPC funds are beginning to be distributed it is imperative that we add detail to our production model including:
* Pre-evaluation of GEMs
* Assignment of module sizes
* Inclusion of additional facilities
I would like to take a doodle poll to decide a date for this meeting. We will hold the meeting "in the morning" on whatever day we all select as best for this discussion. The link to the doodle poll is located here:
I am virtually certain that we'll need a follow-up meeting and we will schedule that later. The goal is to finalize plans for FY18 funding distribution before Thanksgiving so that people can begin the process to get monies transferred to their home institution sooner rather than later.
Thanks,
Tom
-
[Sphenix-tpc-l] CRITICAL--Please Read. sPHENIX TPC Module Production.,
Thomas K Hemmick, 11/02/2017
-
Re: [Sphenix-tpc-l] CRITICAL--Please Read. sPHENIX TPC Module Production.,
Thomas K Hemmick, 11/13/2017
-
Re: [Sphenix-tpc-l] CRITICAL--Please Read. sPHENIX TPC Module Production.,
matt posik, 11/14/2017
- Re: [Sphenix-tpc-l] CRITICAL--Please Read. sPHENIX TPC Module Production., matt posik, 11/14/2017
-
Re: [Sphenix-tpc-l] CRITICAL--Please Read. sPHENIX TPC Module Production.,
matt posik, 11/14/2017
-
Re: [Sphenix-tpc-l] CRITICAL--Please Read. sPHENIX TPC Module Production.,
Thomas K Hemmick, 11/13/2017
Archive powered by MHonArc 2.6.24.