Re: [Sphenix-tpc-l] [sPHENIX_TPC_General] RE: Status of TPC Engineering
- From: Thomas K Hemmick <tkhemmick AT gmail.com>
- To: Dan Cacace <dannycacace AT gmail.com>
- Cc: "Borrelli, Alfonso" <borrelli AT bnl.gov>, Kristina M Finnelli <kristina.finnelli AT stonybrook.edu>, "Biggs, John C" <biggs AT bnl.gov>, "Bellavia, Steven" <bellavia AT bnl.gov>, "sphenix_tpc_general AT stonybrook.edu" <sphenix_tpc_general AT stonybrook.edu>, "Feder, Russell" <rfeder AT bnl.gov>, "Dellapenna Jr, Alfred" <dellapenna AT bnl.gov>, Prakhar Garg <prakhar.garg AT stonybrook.edu>, "Toldo, Frank A" <fatoldo AT bnl.gov>, "Allen, Aron" <allena AT bnl.gov>, "Miraval, Connor" <cmiraval AT bnl.gov>, "La Bounty, James" <labounty AT bnl.gov>, "Runyan, Christopher" <crunyan AT bnl.gov>, "Stiegler, Lori" <stiegler AT bnl.gov>, "Ruggiero, Richard" <ruggiero AT bnl.gov>, "Anerella, Michael D" <mda AT bnl.gov>, Glenn Young <glennyoung82251 AT gmail.com>, "Cozzolino, John" <cozz AT bnl.gov>, Henry Klest <henry.klest AT stonybrook.edu>, "Gortakowski, Charles" <cgortakowski AT bnl.gov>, "maxence.vandenbroucke" <maxence.vandenbroucke AT cea.fr>, "Cacace, Daniel" <dcacace AT bnl.gov>
- Subject: Re: [Sphenix-tpc-l] [sPHENIX_TPC_General] RE: Status of TPC Engineering
- Date: Sun, 27 Mar 2022 13:03:51 -0400
Hi Tom,Attached is the signed drawing for part 0214 as requested. Also attached is the quote that I got from Chicago Metal Rolled Products. Let me know if you need anything else.Thanks,-DanOn Thu, Mar 24, 2022 at 12:56 PM Thomas K Hemmick <tkhemmick AT gmail.com> wrote:Hi gangA brief update on funding for the installation fixtures, etc... I have already ordered metal for all the parts to be made at SBU (using existing funds). There is excellent progress on backstopping the grant as it is now fully in the hands of our contract specialist. Although Monday or Tuesday is most likely for me to have actual spending authority, it is possible that I will have spending authority as early as tomorrow. If I get that authority, I want to start spending right away.I have attached the version of the spreadsheet sent to our department for the backstop funding. The front page summarizes the full set of monies and specifies which items require backstopping for me to make immediate purchases. Here is the basic list of quotations that I will need to get all this out the door:
- TPC Installation
TPC Support
- Xometry I-beam parts -- $14,770.71
INTT Support and Installation:
- Xometry Custom Brackets and Plates -- $26,667.17
- Xometry Support and Cooling -- $5,660.0
I think these are all quotations on hand with you guys. There are also the following that I need help with:
- TPC Hangar Beam.
INTT Installation Pipe
- Need a signed drawing package to send out for bids.
- Need a signed drawing to send out for bids.
The last thing is a verification. There is a MuID plate that we need to make. It is a duplicate to one on the cart.
- Can I get confirmation that the plate in question is drawing 25-2066214?
Thanks guys...three quotations from Xometry, two drawing packages, and one confirmation will be all I need to get everything for this project under way.Thanks,TomOn Thu, Mar 24, 2022 at 11:59 AM 'Miraval, Connor' via sPHENIX_TPC_General <sphenix_tpc_general AT stonybrook.edu> wrote:--Sorry I had to leave the meeting a little early yesterday. I don’t think we had a chance to discuss the HV cable model and lengths, so I am attaching some slides to this email and will be uploading them to the indico as well.
Best Regards,
Connor
From: Ross Corliss <ross.corliss AT stonybrook.edu>
Sent: Wednesday, March 23, 2022 2:04 PM
To: Mills, James A <mills AT bnl.gov>
Cc: Dellapenna Jr, Alfred <dellapenna AT bnl.gov>; Klaus Dehmelt <klaus.dehmelt AT stonybrook.edu>; Kristina M Finnelli <kristina.finnelli AT stonybrook.edu>; Miraval, Connor <cmiraval AT bnl.gov>; Cozzolino, John <cozz AT bnl.gov>; Bellavia, Steven <bellavia AT bnl.gov>; Sakaguchi, Takao <takao AT bnl.gov>; Kuczewski, John <jkuczewski AT bnl.gov>; Pisani, Robert <pisani AT bnl.gov>; Azmoun, Bob <azmoun AT bnl.gov>; Vladislav Zakharov <vladislav.zakharov AT stonybrook.edu>; Henry Klest <henry.klest AT stonybrook.edu>; Prakhar Garg <prakhar.garg AT stonybrook.edu>; Stiegler, Lori <stiegler AT bnl.gov>; Haggerty, John <haggerty AT bnl.gov>; O'Brien, Edward <eobrien AT bnl.gov>; Feder, Russell <rfeder AT bnl.gov>; Glenn Young <glennyoung82251 AT gmail.com>; Gortakowski, Charles <cgortakowski AT bnl.gov>; Ruggiero, Richard <ruggiero AT bnl.gov>; Anerella, Michael D <mda AT bnl.gov>; Cacace, Daniel <dcacace AT bnl.gov>; Toldo, Frank A <fatoldo AT bnl.gov>; Biggs, John C <biggs AT bnl.gov>; La Bounty, James <labounty AT bnl.gov>; Allen, Aron <allena AT bnl.gov>; Runyan, Christopher <crunyan AT bnl.gov>; Kotov, Ivan <kotov AT bnl.gov>; Borrelli, Alfonso <borrelli AT bnl.gov>; maxence.vandenbroucke <maxence.vandenbroucke AT cea.fr>; Hugo Pereira Da Costa <hugo.pereira-da-costa AT cea.fr>; sphenix_tpc_general AT stonybrook.edu
Subject: Re: Status of TPC Engineering
Dear All,
The action items from today's TPC Engineering meeting are below, and the status document is posted on indico as usual:
https://indico.bnl.gov/event/14432/
As always, if you shared slides etc and haven't posted them yet, please do so before the next meeting for posterity's sake.
Our next meeting TPC Engineering meeting will be next week, at the usual coordinates: Wednesday, March 30, at 9:30AM Eastern:
https://indico.bnl.gov/event/14433/
https://bnl.zoomgov.com/j/1606777143?pwd=Nkd6ZWtGejlaR29xNnY1TFA3N3haUT09
-Ross
==========
Dr. Ross Corliss
Research Assistant Professor
Center for Frontiers in Nuclear ScienceStony Brook University
Anyone, if you have a procurement, call it out! Tell Ross, Tom, and >>Ed<<
Bob Azmoun will forward the direct laser attenuator PO to Glenn when he has it.
Bob will do vacuum (voltage?) test of QE of aluminum to confirm what laser power we need.
Chris will ask James about the status of the TPC transportation sled (not cart) is.
Connor will check in on the status of the rack panel layout with Joe.
Connor will forward the TPC Support Structure Xometry quotes to Tom, so he can click 'purchase' when budget is stable (Tom just clicks buttons).
Connor will integrate FEE Cooling lines (1" diam) into the cable routing diagrams (away from TPC toward the recirculator)
Connor will keep the picture frame handy so it can be put on before cabling (Coordinate with Mike Lens)
Connor will look for places where survey marks could be placed (to meet with survey folks before the end of July).
Connor will work on the gas line routing to the TPC WW.
Connor will wrap up the model he showed on 3/2.
Connor, Rich, and Chris will work on putting together an installation document (likely starting with the design review ppt) to help Chris P. (This will also be part of the 'must have' documentation). This will be priority once the parts orders are out.
Connor, Rich, and any others with Xometry or similar quotes for Support and Installation items will send pdf or similar copies of the quotes to Tom.
Dan will contact James Eksi, and ask him to produce the faux-ceramic disks for testing.
Dan will reach out to the TPOT folks and seek a proposal of how they plan to connect to the TPC cooling.
Dan will revise the stand-offs for the controller board.
John C. will consider where we want to put accelerometers (and strain gauges) in order to monitor vibration of the TPC during transport and operation. To be discussed late in the process (July?).
John H, Jim M, and others will think about what high-level documentation we want, and when it is needed.
Julian will work with Dan to revise and complete the dremel fixture for the CM
Kristina will confirm that both cables have a suitable length to around the necessary number of times, by confirming it fits in both extremes of rotation.
Kristina will follow up with Nanomotion about getting an FPGA.
Kristina will follow up with Tom/Keith about details of designing a flex cable. Possibly a zoom conversation with Tom, Keith, Dan.
Rich will order a couple Cylindrical rollers (or all of them, if that makes sense) so Chris R can test how much force is needed to move them. (how to pay for these?)
Rich will present the lift (using a strap on the open end of the tube and the front plate on the other side) when possible.
Rich will purchase Duff Norton jacks fromGrainger.
Rich will reach out to Alex Korel to see if we need to capture the sling on the open end in order for the lift to be 'safe'.
Rob will keep us posted on gas rack news.
Ross et al. need to identify a way to survey the finished CM. (Discussion with the C-AD survey folks maybe? Matt Illardo)
Ross will reach out to Rob on gas rack news via email.
Takao and John H. will make a 'field trip' to Stony Brook to talk about how to mate their side of the cabling to our side. Maybe early next week (last week of March)
Takao or John H. will give updates on the Slice Test.
Takao will report back about first articles for the LV cable harnesses (3/9)
Tom et al will discuss the QLI desire for a nanomotion motor on Friday's Laser meeting
Tom et al. will test voltages for the HV cards once the x-ray box is ready. Resistors will be purchased after this test (they are a negligible cost overall)
Tom will contact Debrecen about the waveform pickoff for the bottom GEM / photodiodes, to see their status (and whether we need a backup plan)
Tom will keep working on the paperwork for prefunding of the support and installation structures
Tom will try to identify any TPC engineering tasks that still need to be addressed.
When needed, someone should make the drawings from the models, get approval, and order.…Connor says ~2 weeks required after we start the process. May want to tie additional things onto the panels, so want to complete routing before purchase.
You received this message because you are subscribed to the Google Groups "sPHENIX_TPC_General" group.
To unsubscribe from this group and stop receiving emails from it, send an email to sphenix_tpc_general+unsubscribe AT stonybrook.edu.
To view this discussion on the web visit https://groups.google.com/a/stonybrook.edu/d/msgid/sphenix_tpc_general/PH0PR09MB8171BFE7E644A1FE27F2811BC5199%40PH0PR09MB8171.namprd09.prod.outlook.com.
You received this message because you are subscribed to the Google Groups "sPHENIX_TPC_General" group.
To unsubscribe from this group and stop receiving emails from it, send an email to sphenix_tpc_general+unsubscribe AT stonybrook.edu.
To view this discussion on the web visit https://groups.google.com/a/stonybrook.edu/d/msgid/sphenix_tpc_general/CAAVEoEe38wku2WQkVSFPsNPm4rHsABZiE6%3DaNQ-7kTf%2BCuFXdA%40mail.gmail.com.
-
[Sphenix-tpc-l] [sPHENIX_TPC_General] Re: Status of TPC Engineering,
Ross Corliss, 03/23/2022
- [Sphenix-tpc-l] [sPHENIX_TPC_General] Re: Status of TPC Engineering, Dan Cacace, 03/23/2022
-
[Sphenix-tpc-l] [sPHENIX_TPC_General] RE: Status of TPC Engineering,
'Miraval, Connor' via sPHENIX_TPC_General, 03/24/2022
-
Re: [Sphenix-tpc-l] [sPHENIX_TPC_General] RE: Status of TPC Engineering,
Thomas K Hemmick, 03/24/2022
-
Re: [Sphenix-tpc-l] [sPHENIX_TPC_General] RE: Status of TPC Engineering,
Dan Cacace, 03/27/2022
-
Re: [Sphenix-tpc-l] [sPHENIX_TPC_General] RE: Status of TPC Engineering,
Thomas K Hemmick, 03/27/2022
- Re: [Sphenix-tpc-l] [sPHENIX_TPC_General] RE: Status of TPC Engineering, Dan Cacace, 03/27/2022
-
Re: [Sphenix-tpc-l] [sPHENIX_TPC_General] RE: Status of TPC Engineering,
Thomas K Hemmick, 03/27/2022
-
Re: [Sphenix-tpc-l] [sPHENIX_TPC_General] RE: Status of TPC Engineering,
Dan Cacace, 03/27/2022
-
Re: [Sphenix-tpc-l] [sPHENIX_TPC_General] RE: Status of TPC Engineering,
Thomas K Hemmick, 03/24/2022