sphenix-tracking-l AT lists.bnl.gov
Subject: sPHENIX tracking discussion
List archive
[Sphenix-tracking-l] INTT layer lengths needed to match TPC acceptance
- From: "Frawley, Anthony" <afrawley AT fsu.edu>
- To: "sphenix-tracking-l AT lists.bnl.gov" <sphenix-tracking-l AT lists.bnl.gov>
- Subject: [Sphenix-tracking-l] INTT layer lengths needed to match TPC acceptance
- Date: Thu, 8 Sep 2016 21:17:01 +0000
Hi All,
I have posted some slides to (note, no actual meeting is planned for tomorrow, I will be traveling):
https://indico.bnl.gov/conferenceDisplay.py?confId=2374
showing my conclusions about the length of the INTT layers that are needed to match the acceptance of the TPC if we assume collisions in the collision Z vertex range of +/- 10 cm.
There are two files linked to the entry, one is a pdf containing my slides, the other is a pdf of Walt Sondheim's drawing showing the required active INTT layer lengths.
Please have a look - the results may surprise you. All comments are welcome.
Cheers
Tony
-
[Sphenix-tracking-l] INTT layer lengths needed to match TPC acceptance,
Frawley, Anthony, 09/08/2016
- Re: [Sphenix-tracking-l] INTT layer lengths needed to match TPC acceptance, Itaru Nakagawa, 09/08/2016
Archive powered by MHonArc 2.6.24.