Skip to Content.
Sympa Menu

sphenix-tracking-l - [Sphenix-tracking-l] INTT layer lengths needed to match TPC acceptance

sphenix-tracking-l AT lists.bnl.gov

Subject: sPHENIX tracking discussion

List archive

Chronological Thread  
  • From: "Frawley, Anthony" <afrawley AT fsu.edu>
  • To: "sphenix-tracking-l AT lists.bnl.gov" <sphenix-tracking-l AT lists.bnl.gov>
  • Subject: [Sphenix-tracking-l] INTT layer lengths needed to match TPC acceptance
  • Date: Thu, 8 Sep 2016 21:17:01 +0000

Hi All,


I have posted some slides to (note, no actual meeting is planned for tomorrow, I will be traveling):


https://indico.bnl.gov/conferenceDisplay.py?confId=2374


showing my conclusions about the length of the INTT layers that are needed to match the acceptance of the TPC if we assume collisions in the collision Z vertex range of +/- 10 cm.


There are two files linked to the entry, one is a pdf containing my slides, the other is a pdf of Walt Sondheim's drawing showing the required active INTT layer lengths.


Please have a look - the results may surprise you. All comments are welcome.


Cheers

Tony







Archive powered by MHonArc 2.6.24.

Top of Page