Skip to Content.
Sympa Menu

star-fcv-l - Re: [Star-fcv-l] STAR presentation by Xingrui Gou for SQM 2022 submitted for review

star-fcv-l AT lists.bnl.gov

Subject: STAR Flow, Chirality and Vorticity PWG

List archive

Chronological Thread  
  • From: xgou <xgou AT rcf.rhic.bnl.gov>
  • To: subhash <subhash AT rcf.rhic.bnl.gov>, "STAR Flow, Chirality and Vorticity PWG" <star-fcv-l AT lists.bnl.gov>
  • Cc: gouxingrui123 AT 163.com
  • Subject: Re: [Star-fcv-l] STAR presentation by Xingrui Gou for SQM 2022 submitted for review
  • Date: Tue, 23 Aug 2022 22:48:34 +0800

Dear Subhash,

Thank you very much for your comments and sign-off!

I have implemented your comments and uploaded the new version here:
https://drupal.star.bnl.gov/STAR/node/60590

Thanks and best regards,
Xingrui

Dear Xingrui,

Nice proceedings. Here are my suggestions for your consideration:

In General add an extra space between end of line and reference. e.g.
in line 23 "spin-orbital interaction [1]."
line 8: system's
line 25: in parent's rest frame
line 29: Those models --> Some models; also add references for model studies.
line 30: system size dependence of ...
line 42, Fig. 1 Caption: space between 200 and GeV
line 44: first-order event plane can be determined by ...
you can spell out ZDC-SMD and TPC here.
you can mention lambda-bar decay channel in bracket
line 45: Here and elsewhere use \mathrm{Res}, \mathrm{sin}, etc

line 47: Use consistently either P_{H} or P_{Lambda}
line 48: I think better to say, increases from central to peripheral ...
line 58: system size dependence

Figure 3 Caption: Correct typo "acceptance". Remove "shown inside the figure"
line 62-63: add respectively.
line 65: space between Fig.3 (right). Similarly add extra space at
Figure 4 captions.

I sign off with these addressed.

Thanks and regards,
Subhash



On 2022-08-23 02:52 PM, webmaster--- via Star-fcv-l wrote:
Dear star-fcv-l AT lists.bnl.gov members,

Xingrui Gou (gouxingrui123 AT 163.com) has submitted a material for a review,
please have a look:
https://drupal.star.bnl.gov/STAR/node/60590

Deadline: 2022-08-28
---
If you have any problems with the review process, please contact
webmaster AT www.star.bnl.gov
_______________________________________________
Star-fcv-l mailing list
Star-fcv-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fcv-l
_______________________________________________
Star-fcv-l mailing list
Star-fcv-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fcv-l




Archive powered by MHonArc 2.6.24.

Top of Page