star-fst-l AT lists.bnl.gov
Subject: Star-fst-l mailing list
List archive
[Star-fst-l] Patch Panel Board Modification and T-Board PCB Count
- From: "Valentino, Stephen" <svalentino AT bnl.gov>
- To: "star-fst-l AT lists.bnl.gov" <star-fst-l AT lists.bnl.gov>
- Subject: [Star-fst-l] Patch Panel Board Modification and T-Board PCB Count
- Date: Fri, 5 Apr 2019 13:17:04 +0000
Hi Zhenyu,
As discussed in the meeting on Sunday, BNL will assemble the prototype
T-Boards and solder them to the Inner Signal Cables for the test stand. We
ordered 10 cables as requested but there are only 6 bare T-Board PCBs
available.
We'll assemble one board, test it, then assemble the other 5. Can we wait
until the first cable/T-Board assembly is confirmed in the test setup before
ordering the remaining T-Boards for the test cables? I think this depends on
when you need all 10 cable/T-board assemblies completed. Either way, there's
probably not much risk if more prototype T-boards are ordered now. I assume
the plan is to order the actual 36 (plus some spare) production T-Boards
after the prototype board is fully vetted in the future test setup.
Gerard,
Attached is the modification instructions for the Patch Panel boards. Let me
know if you have any comments. We should start this in a few weeks.
We'll test the individual boards after the modification and the fully
assembled panels should be tested in the future test setup.
Regards,
Steve Valentino
631-344-4644
Attachment:
FST Modifications to IST Patch Panel Board_4APR19.png
Description: FST Modifications to IST Patch Panel Board_4APR19.png
-
[Star-fst-l] Patch Panel Board Modification and T-Board PCB Count,
Valentino, Stephen, 04/05/2019
- Re: [Star-fst-l] Patch Panel Board Modification and T-Board PCB Count, Zhenyu Ye, 04/05/2019
Archive powered by MHonArc 2.6.24.