Minutes:

Attendee: Michael Capotosto, Jianing Dong, Yu Hu, Te-Chuan Huang, Han-Sheng
Li, Prithwish Tribedy, Yi Yang, Zhenyu Ye

News:
1. Hamamatsu is ready to ship baby sensors and test structures
2. Working on Statement of Work and contract for module assembly at Fermilab
3. Contacted people for IST cooling system maintenance

Hybrid, T-board and inner signal cables:
1. will buy female connectors for T-board assembly from SDU because of the
long delivery time from US. After agreeing on the numbers of connectors,
Jianing will place the order, and expect to receive them in 8-10 weeks. She
will send the female connectors to BNL for T-board assembly
2. Jianing will send the final designs of hybrid and T-board to vendor
tomorrow, and expect to receive the actual pieces in 3 weeks

Mechanical structure:
1. Yi will sign the contract with the vendor next week. Expect to receive two
3D printed modules in 10 days. Will send one to UIC for module assembly
discussion with Fermilab. Expect t receive the actual modules by the end of
August
2. Yi is looking into connectors for cooling tubes

Module assembly and testing
1. Andres mounted and wire-bond 8 APV chips onto the FST inner and outer
hybrids. He was able to see signals from a few of them but not all. Will
check the wire-bonds to see if there is any problem
2. Michael will help Prithwish to go around the interlock on the IST crate in
the BNL Physics building so that he can power up the crate

Simulation
1. The new FST geometry with complete structures is made by Te-Chuan. He will
update the FST geometry to make it consistent with the latest design.
2. Te-Chuan met Krishan and gave him the codes for simulation. Expect
follow-ups from Krishan to run these codes and provide feedbacks




> On Jul 18, 2019, at 12:46 AM, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
>
> Dear all,
>
> We will have a meeting at 9am BNL time tomorrow (Thursday July 18). The
> meeting agenda and bluejeans info can be found at
>
> https://drupal.star.bnl.gov/STAR/blog/yezhenyu/forward-silicon-tracker-weekly-meeting
>
> 1. News - All
> 2. Hybrid, T-board, Inner Signal Cable - Jianing Dong, Mike Capotosto,
> Gerard Visser
> 3. Mechanical Structure - Yi Yang, Han-sheng Li
> 4. Module Assembly and Test - Andres Aguilar
> 5. Simulation - Te-Chuan Huang, Krishan Gopal
>
> Best,
> Zhenyu
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l





Archive powered by MHonArc 2.6.24.

Top of Page