- From: Zhenyu Ye <yezhenyu2003 AT gmail.com>
- To: Han-Sheng Li <acidhf AT gmail.com>
- Cc: star-fst-l AT lists.bnl.gov
- Subject: Re: [Star-fst-l] Weekly FST meeting - 9/12/2019
- Date: Fri, 13 Sep 2019 10:30:16 -0500
Thanks, Han-Sheng. Can you please tell me the dimensions of the box in x-y-z?
Zhenyu
> On Sep 13, 2019, at 2:25 AM, Han-Sheng Li <acidhf AT gmail.com> wrote:
>
> Dear Zhenyu,
>
> Please find the drawing for holding frames shown in here:
> https://drupal.star.bnl.gov/STAR/blog/hshengli/holding-frames
>
> Best regards,
> Han-Sheng
>
> Zhenyu Ye <yezhenyu2003 AT gmail.com> 於 2019年9月13日 週五 上午2:47寫道:
> Meeting minutes:
>
> 1. News: BNL approved funds to support FST. Contract with Fermilab SiDet
> for FST module assembly has been put into BNL system since last week.
> According to the SOW, we need to provide Fermilab drawings for FST modules,
> Silicon sensors, hybrids and holding frames by this Sunday Sep 15.
>
> 2. DAQ: Tonko found 2 ARCII and at least 1 ARM are removed from the IST
> crates. 1 ARCII and 1 ARM are in the lab in Physics building. Gerard and
> Tonko will verify the status of the IST crates and readout boards next
> week. Gerard and Paul will try to see if the IST slow control still works.
> Prithwish and Yu will try to learn from them and provide assistance if
> needed.
>
> 3. Shipping
> Han-sheng/Yi: designed a box to ship FST modules.
>
> 4. Mechanical structure: EASTON will make the prototype mechanical
> structure in October. AIDC will produce 10 prototype cooling tubes and
> joints in October, and 55 in December. AIDC has done initial hybrid gluing
> to mechanical structure by eye. The tolerance for Hybrid fabrication is 200
> microns, and mechanical structure 100 microns.
>
> 5. Silicon sensors
> Yi: Yi and Zhangbu visited NDL last week. The NDL staffs think they are
> able to produce Silicon sensors but will take some time (~8 months) to find
> the proper settings for implantation and polysilicon. A new NCKU Master
> student will work on this.
>
> 6. Hybrid, T-board, and Inner signal cables
> Qian: Nicomatics connectors for T-boards have arrived in China. The agency
> is checking with the vendor to see if there is any issue with these
> connectors.
>
> 7. Simulation
> Te-chuan: still working on FST GEANT modeling for cooling tube, and will
> add APV chips and T-boards. He will report them next week.
> Krishan: waiting for Daniel to provide the updated tracking code so that he
> could study how efficiency depends on R.
>
> Action items:
> 1. Prithwish will bring the ARCII and ARM back to STAR, and check exactly
> how many ARMs are removed from the IST crates, and will try to look for the
> other missing ARCII.
> 2. Flemming will find out from Rahul whether NOVEC has been delivered and
> if so contact Gerrit for having a look at the IST rack.
> 3. Han-sheng will add 2 more screws to fix the FST module in the box, and
> send Zhenyu the updated drawings and movie this Friday or Saturday.
> 4. We will check if we can use the PELICAN boxes which were used for
> shipping IST modules for FST modules. Flemming found three of them at BNL.
> 5. Yi is working on the documentation of the mechanical structure. He has
> the inputs from EASTON and AIDC in Chinese and will convert them to
> English.
> 6. Yi will discuss with AIDC for the precision they can achieve and whether
> or not specific fixtures are needed for mounting hybrids to mechanical
> structure
> 7. There are a number of studies to study the number of segmentation and
> Z-locations that should be done once the tracking code is ready.
>
>
> > On Sep 10, 2019, at 9:08 PM, Zhenyu Ye <yezhenyu2003 AT gmail.com> wrote:
> >
> > Dear all,
> >
> > We will have a meeting at 9am BNL time this Thursday Sep 12. The meeting
> > agenda and bluejeans info can be found at
> >
> > https://drupal.star.bnl.gov/STAR/blog/yezhenyu/forward-silicon-tracker-weekly-meeting
> >
> > 1. News - All
> > 2. Silicon sensor - Zhenyu Ye, Yi Yang
> > 2. T-board, Hybrid, Inner Signal Cable - Jianing Dong, Michael Capotosto,
> > Gerard Visser
> > 3. Mechanical Structure - Yi Yang, Han-sheng Li
> > 4. Simulation - Te-Chuan Huang, Krishan Gopal
> >
> > Best,
> > Zhenyu
> > _______________________________________________
> > Star-fst-l mailing list
> > Star-fst-l AT lists.bnl.gov
> > https://lists.bnl.gov/mailman/listinfo/star-fst-l
>
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l
-
[Star-fst-l] Weekly FST meeting - 9/12/2019,
Zhenyu Ye, 09/10/2019
-
Re: [Star-fst-l] Weekly FST meeting - 9/12/2019,
Zhenyu Ye, 09/12/2019
-
Re: [Star-fst-l] Weekly FST meeting - 9/12/2019,
Han-Sheng Li, 09/13/2019
-
Re: [Star-fst-l] Weekly FST meeting - 9/12/2019,
Zhenyu Ye, 09/13/2019
- Re: [Star-fst-l] Weekly FST meeting - 9/12/2019, Han-Sheng Li, 09/13/2019
-
Re: [Star-fst-l] Weekly FST meeting - 9/12/2019,
Zhenyu Ye, 09/13/2019
-
Re: [Star-fst-l] Weekly FST meeting - 9/12/2019,
Han-Sheng Li, 09/13/2019
-
Re: [Star-fst-l] Weekly FST meeting - 9/12/2019,
Zhenyu Ye, 09/12/2019
Archive powered by MHonArc 2.6.24.