Meeting minutes

Attendees: Flemming, Jianing, Krishan, Mike, Prithwish, Te-Chuan, Yi, Yu,
Zhenyu

Module assembly - Zhenyu
Met Fermilab engineers last Thursday. Collecting information to answer their
questions.

Module holding frame/box - Yi/Han-Sheng
Yi will discuss with Han-Sheng to make further changes to allow access to
modules from both sides.

Inner signal cables - Mike
Received connectors from SDU yesterday, will send the 6 remaining test-cables
and connectors out to assembly company for soldering. Also requested quotes
for alternative production cable yesterday

IST DAQ - Gerard
See below

BNL test stand - Prithwish
Learnt how to power things up and connect. Will try to understand the mapping
between hardware and software, and play with the test stand once the DAQ
software is installed and connect it eventually to IST modules.

Mechanical structure - Yi
Easton is producing 18 sets of mechanical structures, expect to finish before
middle Oct.
AIDC is making 16 sets of cooling tubes, expect 10 before the end of
September with leakage tests
External company is assembling 8 sets of hybrids with connectors and passive
components, expect to finish middle Oct
Writing document, expect to finish middle Oct.
Decided on cooling tube connector types, and soft tubes. Will discuss next
week.

Simulation - Te-Chuan
Added cooling tubes and coolant to STAR GEANT model. Has checked that there
is no over-loop between the volumes. Will work on change water to Novec for
the coolant, and add the cooling blocks


> On Sep 26, 2019, at 7:21 AM, Gerard Visser <gvisser AT indiana.edu> wrote:
>
> hi Zhenyu,
> I may not be able to make the meeting, still tbd.
> But as to the FST readout commissioning (i.e. IST re-commissioning)
> we think that is in good shape after last week's efforts:
>
> - Tonko updated various DAQ software parts on the PC (and renamed it
> ist01->fst01). Also reconnected the RORC's and fibers which had been
> disconnected for some reason.
> - Likewise Tonko prepared the FST TCD.
> - I reinstalled the ARC-II and ARM that Prithwish had, and located the
> other ARC-II that was missing (it was the former GMT one, swapped out
> during run 19 due to some issues)
> - I found Tim's interlock cheater setup in IST rack and that worked fine
> - I tested w/ test DAQ software (1 fiber at a time) and it worked
> - I made a small firmware change to fix one longstanding issue, and applied
> this update
> - Then Tonko ran full DAQ, mostly results were good but some token errors
> - Subsequently I tried test DAQ again, saw the errors, realized I did
> something wrong in the firmware, resolved that with another new version,
> and tested again and all seems fine
> - Then one ARM and one ARC-II pulled for Prithwish's lab setup again
>
> Note: The ex-GMT ARC-II is now FST RDO #4, we did not see any
> problems with it, so we just have to watch that one. I'll deal with it in
> 2021 if that proves to have a problem after all. If so, likely swapping the
> SIU would fix it.
> Sincerely,
>
> Gerard
>
>
> On 9/24/2019 6:24 PM, Ye, Zhenyu wrote:
>> Dear all,
>> We will have a meeting starting at 9am BNL time this Thursday Sep 26.
>> The meeting agenda and bluejeans info can be found at
>> https://drupal.star.bnl.gov/STAR/blog/yezhenyu/forward-silicon-tracker-weekly-meeting
>> 1. News - All
>> 2. IST DAQ and BNL test stand for FST - Gerard Visser, Prithwish
>> Tribedy/Yu Hu
>> 3. Module Assembly - Zhenyu Ye
>> 4. Mechanical Structure - Yi Yang, Han-sheng Li
>> 5. Simulation - Te-Chuan Huang, Krishan Gopal
>> Gerard, I don’t know if you or Tonko have time to attend the meeting. If
>> not, can you please send a summary of the work/conclusion you and Tonko
>> did on IST DAQ crates for FST?
>> Thanks and Best,
>> Zhenyu
>> _______________________________________________
>> Star-fst-l mailing list
>> Star-fst-l AT lists.bnl.gov
>> https://lists.bnl.gov/mailman/listinfo/star-fst-l
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l




Archive powered by MHonArc 2.6.24.

Top of Page