hi Zhenyu,
I may not be able to make the meeting, still tbd.
But as to the FST readout commissioning (i.e. IST re-commissioning) we think that is in good shape after last week's efforts:

- Tonko updated various DAQ software parts on the PC (and renamed it ist01->fst01). Also reconnected the RORC's and fibers which had been disconnected for some reason.
- Likewise Tonko prepared the FST TCD.
- I reinstalled the ARC-II and ARM that Prithwish had, and located the other ARC-II that was missing (it was the former GMT one, swapped out during run 19 due to some issues)
- I found Tim's interlock cheater setup in IST rack and that worked fine
- I tested w/ test DAQ software (1 fiber at a time) and it worked
- I made a small firmware change to fix one longstanding issue, and applied this update
- Then Tonko ran full DAQ, mostly results were good but some token errors
- Subsequently I tried test DAQ again, saw the errors, realized I did something wrong in the firmware, resolved that with another new version, and tested again and all seems fine
- Then one ARM and one ARC-II pulled for Prithwish's lab setup again

Note: The ex-GMT ARC-II is now FST RDO #4, we did not see any problems with it, so we just have to watch that one. I'll deal with it in 2021 if that proves to have a problem after all. If so, likely swapping the SIU would fix it.
Sincerely,

Gerard


On 9/24/2019 6:24 PM, Ye, Zhenyu wrote:
Dear all,

We will have a meeting starting at 9am BNL time this Thursday Sep 26.
The meeting agenda and bluejeans info can be found at

https://drupal.star.bnl.gov/STAR/blog/yezhenyu/forward-silicon-tracker-weekly-meeting

1. News - All
2. IST DAQ and BNL test stand for FST - Gerard Visser, Prithwish Tribedy/Yu Hu
3. Module Assembly - Zhenyu Ye
4. Mechanical Structure - Yi Yang, Han-sheng Li
5. Simulation - Te-Chuan Huang, Krishan Gopal

Gerard, I don’t know if you or Tonko have time to attend the meeting. If not,
can you please send a summary of the work/conclusion you and Tonko did on IST
DAQ crates for FST?

Thanks and Best,
Zhenyu


_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l





Archive powered by MHonArc 2.6.24.

Top of Page