Gerard,

I've checked with John Hammond, we do have access to some IPC specs, but none
applicable to flex boards.

--Mike

-----Original Message-----
From: Star-fst-l <star-fst-l-bounces AT lists.bnl.gov> On Behalf Of Zhenyu Ye
Sent: Thursday, October 17, 2019 7:18 PM
To: Gerard Visser <gvisser AT indiana.edu>
Cc: star-fst-l AT lists.bnl.gov
Subject: Re: [Star-fst-l] Weekly FST meeting - 10/17/2019

Hi Gerard, I did not expect mounting R/C/connectors onto hybrid would be a
problem, since it must have been done on a daily basis by many vendors. But
surprises seem to arise everywhere. Maybe Yi can find out why the assembly
vendor did not follow such a “standard” procedure. Has the vendor done
assembly work with hybrid PCBs before?

Zhenyu

> On Oct 17, 2019, at 4:53 PM, Gerard Visser <gvisser AT indiana.edu> wrote:
>
> hi Zhenyu, Jianing,
> I am surprised that the assembly vendor did not bake the hybrids no
> matter how they may have been packed. It is my understanding that would be
> standard procedure for multilayer flex circuits, see e.g.
> https://urldefense.proofpoint.com/v2/url?u=https-3A__blog.epectec.com_why-2Dpre-2Dbake-2Dflex-2Dpcb-2Dprior-2Dto-2Dassembly&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=8ygAAI6gQzVe9hFCRdEAO5MwBJh2ID34fiwLpV3P1Xo&m=giOH7RS5Xa-xGGwScwvBQl-StfhXSE1nzFUC09bfW3U&s=p4gT8sQiokgPYN24qO4W4TTOdaeXD9Xlq1OvlsXrdWw&e=
> . (I do not have a copy ($$) of the IPC standards mentioned there but
> perhaps BNL/Mike can access them somehow?) It seems to me if your assembly
> drawing references IPC standards (as is probably best) then the vendor
> ought to know about all this and get it right.
> Anyway, with heightened awareness on their part now it should be good
> for the future, I am confident. Storage in vacuum packs would be beneficial
> of course but probably does not eliminate the need to bake. (I am not sure
> about that.)
> Sincerely,
>
> Gerard
>
>
> On 10/17/2019 5:31 PM, Zhenyu Ye wrote:
>> Minutes:
>> Attendees: Elke, Han-Sheng, Jianing, Krishan, Mike, Prithwish, Zhenyu
>> *** Mechanical structure: We went through Yi’s slides w/o his presence.
>> Some questions were already communicated to him by email. Other questions
>> were asked:
>> 1. Elke: what causes bending of the structure and how the vendor is going
>> to fix it?
>> Because Yi was not present to answer this question, ZY explained his
>> understanding based on the brief discussion with Yi on Tuesday (Yi, please
>> correct me if I am wrong). The bending was believed to be caused by
>> unevenly distributed material during injection and formation. The vendor
>> was going to add additional injection points and distribution tunnels.
>> This is not mentioned in Yi’s slide, but instead they are going to add a
>> rib to strengthen the structure.
>> 2. Elke: What caused the bubbles in the hybrids? Is baking hybrids at
>> 120 degree a standard procedure? Do we have documents from the vendors on
>> the recommended procedure and/or requirements ZY answer for Yi: The
>> company in Taiwan to do the soldering thinks that the bubbles may be
>> caused by water vapor intrusion during the transportation. They expected
>> hybrids sealed in vacuum bags to prevent it from happening during
>> transportation and storage, but this was not the practice done by the
>> Chinese vendor, which made the hybrids.
>> Jianing: after communicating the “bubble” issue with the Chinese vendor,
>> they recommended baking hybrids at 120 degree C for 2 hours before
>> soldering. JIaning will try to get the recommended handling and soldering
>> procedure from the hybrid vendors. She will also ask the vendors to use
>> vacuum bags. She has contacted two vendors (the old + a new ones) to make
>> new outer hybrids with modified APV positions, and the new vendor to make
>> new inner hybrids. The latter will need the confirmation from ZY that the
>> 0.528mm shift is not a problem for wire-bonding at Fermilab.
>> *** hybrids
>> Jianing: The delivery time for new hybrids from the old vendor is 2-3
>> weeks, and 3-4 weeks from the new vendor.
>> ZY: unless the 0.528mm shift is found to be an issue, we should stick to
>> the current inner hybrid design.
>> *** Module assembly
>> ZY met the Fermilab engineers and technicians on Wednesday. They confirmed
>> that 0.011mm shift for sensor-APV bonding pads for the outer region won’t
>> be a problem. The technician does not think the 0.528mm shift for the
>> inner region is a problem either, but she will double check. Also started
>> discussing fabrication of the assembly fixture, e.g., machine shop
>> options, materials, etc.
>> *** F2F meeting at BNL for forward upgrade The STAR management
>> started discussing the need to hold a 2-3 day workshop on
>> Spin/Forward upgrade in early 2020 (e.g. January)
>>> On Oct 15, 2019, at 5:10 PM, Zhenyu Ye <yezhenyu2003 AT gmail.com> wrote:
>>>
>>> Dear all,
>>>
>>> We will have a meeting starting at 9am BNL time this Thursday Oct
>>> 17. The meeting agenda and bluejeans info can be found at
>>> https://drupal.star.bnl.gov/STAR/blog/yezhenyu/forward-silicon-track
>>> er-weekly-meeting
>>>
>>> 1. News - All
>>> 2. Mechanical Structure - Yi Yang, Han-sheng Li 3. Hybrid - Jianing
>>> Dong 4. Module Assembly - Zhenyu Ye
>>>
>>> If you have other updates and items for discussion, please add them to
>>> the agenda.
>>>
>>> Thanks and Best,
>>> Zhenyu
>>>
>>>
>> _______________________________________________
>> Star-fst-l mailing list
>> Star-fst-l AT lists.bnl.gov
>> https://lists.bnl.gov/mailman/listinfo/star-fst-l
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l

_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l



Archive powered by MHonArc 2.6.24.

Top of Page