Zhenyu,

This is the first email chain I had with Steve regarding the test stand cable
drawing. It was initially made for the "V1" T-Board (Not produced), and
updated to Rev B for V2.0 it looks like. I've attached copies of the
attachments as sent to John and Steve.

I've also attached a different version of the cable drawing, everything is
the same, except the font was changed to make the document searchable. The
file name was updated with a new date, 4-18-19, but none of the information
was changed, just the fonts. This was not "up-revved". This was done in a
separate chain, which again had no replies from Steve.

I believe the changes were discussed in person between Steve and I at the
time, hence the lack of email replies.

Additionally, I've created a blog post containing all the documents that John
attached to the PO for the cable, as well as a copy of the PO itself. It can
be found at
https://drupal.star.bnl.gov/STAR/blog/capotosto/fst-test-stand-cable-po-documentation-po-0000363726


--Mike








-----Original Message-----
From: Hammond, John <hammond AT bnl.gov>
Sent: Thursday, March 28, 2019 4:14 PM
To: Capotosto, Michael <capotosto AT bnl.gov>
Subject: RE: FST Inner cable test Stand Version Run List

Mike,

I placed the drawings on the p drive.
I also removed the text "model" from the end of the file name on the pdf file.

John

-----Original Message-----
From: Capotosto, Michael
Sent: Thursday, March 28, 2019 12:19 PM
To: Hammond, John <hammond AT bnl.gov>
Subject: RE: FST Inner cable test Stand Version Run List

John,

Some changes were left off, final Rev B attached. Disregard previous email.

--Mike

-----Original Message-----
From: Capotosto, Michael
Sent: Thursday, March 28, 2019 10:43 AM
To: Hammond, John <hammond AT bnl.gov>
Subject: RE: FST Inner cable test Stand Version Run List

John,

I created a Rev B, attached. Please update.

Thanks

--Mike
-----Original Message-----
From: Capotosto, Michael
Sent: Wednesday, March 20, 2019 3:16 PM
To: Hammond, John <hammond AT bnl.gov>
Subject: FW: FST Inner cable test Stand Version Run List

John,

Please put these on the P: drive where appropriate.

Thanks

--Mike

-----Original Message-----
From: Capotosto, Michael
Sent: Wednesday, March 20, 2019 1:51 PM
To: Valentino, Stephen <svalentino AT bnl.gov>
Subject: RE: FST Inner cable test Stand Version Run List

Steve,

I updated the drawings, also included PDF.

--Mike

-----Original Message-----
From: Capotosto, Michael
Sent: Wednesday, March 20, 2019 12:19 PM
To: Valentino, Stephen <svalentino AT bnl.gov>
Subject: RE: FST Inner cable test Stand Version Run List

Steve,

See attached latest revision of prelim drawings for your review.

Also let me know if you want your name added on the title block, if you're
going to be presenting it.

--Mike



-----Original Message-----
From: Valentino, Stephen
Sent: Tuesday, March 05, 2019 1:37 PM
To: Capotosto, Michael <capotosto AT bnl.gov>
Subject: FST Inner cable test Stand Version Run List



Regards,
Steve Valentino
631-344-4644

Attachment: FST CABLE DRAWING TEST STAND 3-28-19 REVISION B.dwg
Description: FST CABLE DRAWING TEST STAND 3-28-19 REVISION B.dwg

Attachment: FST CABLE DRAWING TEST STAND 3-28-19 REVISION B-Model.pdf
Description: FST CABLE DRAWING TEST STAND 3-28-19 REVISION B-Model.pdf

Attachment: FST CABLE DRAWING TEST STAND 4-18-19 REVISION B-[SEARCHABLE 2].pdf
Description: FST CABLE DRAWING TEST STAND 4-18-19 REVISION B-[SEARCHABLE 2].pdf




Archive powered by MHonArc 2.6.24.

Top of Page