Re: [Star-fst-l] FW: FST Inner cable test Stand Version Run List
- From: Zhenyu Ye <yezhenyu2003 AT gmail.com>
- To: "Capotosto, Michael" <capotosto AT bnl.gov>
- Cc: "star-fst-l AT lists.bnl.gov" <star-fst-l AT lists.bnl.gov>
- Subject: Re: [Star-fst-l] FW: FST Inner cable test Stand Version Run List
- Date: Fri, 18 Oct 2019 11:30:30 -0500
Hi Mike, thank you for finding these emails.
During today’s meeting, you said an updated spreadsheet with the correct wire
soldering map and instruction for T-board 2.0 was sent to the assembly
vendor, so the 4 test cables with T-board 2.0 I received in May were made
correctly. Do I understand this correctly? Do you have the email
communications on this with Steve or the vendor?
Thanks,
Zhenyu
> On Oct 18, 2019, at 10:46 AM, Capotosto, Michael <capotosto AT bnl.gov> wrote:
>
> Zhenyu,
>
> This is the first email chain I had with Steve regarding the test stand
> cable drawing. It was initially made for the "V1" T-Board (Not produced),
> and updated to Rev B for V2.0 it looks like. I've attached copies of the
> attachments as sent to John and Steve.
>
> I've also attached a different version of the cable drawing, everything is
> the same, except the font was changed to make the document searchable. The
> file name was updated with a new date, 4-18-19, but none of the information
> was changed, just the fonts. This was not "up-revved". This was done in a
> separate chain, which again had no replies from Steve.
>
> I believe the changes were discussed in person between Steve and I at the
> time, hence the lack of email replies.
>
> Additionally, I've created a blog post containing all the documents that
> John attached to the PO for the cable, as well as a copy of the PO itself.
> It can be found at
> https://drupal.star.bnl.gov/STAR/blog/capotosto/fst-test-stand-cable-po-documentation-po-0000363726
>
>
> --Mike
>
>
>
>
>
>
>
>
> -----Original Message-----
> From: Hammond, John <hammond AT bnl.gov>
> Sent: Thursday, March 28, 2019 4:14 PM
> To: Capotosto, Michael <capotosto AT bnl.gov>
> Subject: RE: FST Inner cable test Stand Version Run List
>
> Mike,
>
> I placed the drawings on the p drive.
> I also removed the text "model" from the end of the file name on the pdf
> file.
>
> John
>
> -----Original Message-----
> From: Capotosto, Michael
> Sent: Thursday, March 28, 2019 12:19 PM
> To: Hammond, John <hammond AT bnl.gov>
> Subject: RE: FST Inner cable test Stand Version Run List
>
> John,
>
> Some changes were left off, final Rev B attached. Disregard previous email.
>
> --Mike
>
> -----Original Message-----
> From: Capotosto, Michael
> Sent: Thursday, March 28, 2019 10:43 AM
> To: Hammond, John <hammond AT bnl.gov>
> Subject: RE: FST Inner cable test Stand Version Run List
>
> John,
>
> I created a Rev B, attached. Please update.
>
> Thanks
>
> --Mike
> -----Original Message-----
> From: Capotosto, Michael
> Sent: Wednesday, March 20, 2019 3:16 PM
> To: Hammond, John <hammond AT bnl.gov>
> Subject: FW: FST Inner cable test Stand Version Run List
>
> John,
>
> Please put these on the P: drive where appropriate.
>
> Thanks
>
> --Mike
>
> -----Original Message-----
> From: Capotosto, Michael
> Sent: Wednesday, March 20, 2019 1:51 PM
> To: Valentino, Stephen <svalentino AT bnl.gov>
> Subject: RE: FST Inner cable test Stand Version Run List
>
> Steve,
>
> I updated the drawings, also included PDF.
>
> --Mike
>
> -----Original Message-----
> From: Capotosto, Michael
> Sent: Wednesday, March 20, 2019 12:19 PM
> To: Valentino, Stephen <svalentino AT bnl.gov>
> Subject: RE: FST Inner cable test Stand Version Run List
>
> Steve,
>
> See attached latest revision of prelim drawings for your review.
>
> Also let me know if you want your name added on the title block, if you're
> going to be presenting it.
>
> --Mike
>
>
>
> -----Original Message-----
> From: Valentino, Stephen
> Sent: Tuesday, March 05, 2019 1:37 PM
> To: Capotosto, Michael <capotosto AT bnl.gov>
> Subject: FST Inner cable test Stand Version Run List
>
>
>
> Regards,
> Steve Valentino
> 631-344-4644
>
> <FST CABLE DRAWING TEST STAND 3-28-19 REVISION B.dwg><FST CABLE DRAWING
> TEST STAND 3-28-19 REVISION B-Model.pdf><FST CABLE DRAWING TEST STAND
> 4-18-19 REVISION B-[SEARCHABLE
> 2].pdf>_______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l
-
[Star-fst-l] FW: FST Inner cable test Stand Version Run List,
Capotosto, Michael, 10/18/2019
-
Re: [Star-fst-l] FW: FST Inner cable test Stand Version Run List,
Zhenyu Ye, 10/18/2019
- Re: [Star-fst-l] FW: FST Inner cable test Stand Version Run List, Capotosto, Michael, 10/18/2019
-
Re: [Star-fst-l] FW: FST Inner cable test Stand Version Run List,
Zhenyu Ye, 10/18/2019