Minutes
Attendees: Elke, Flemming, Gerard, Hu, Jianing, Krishan, Mike, Prithwish,
Zhenyu
Mechanical structure - Yi (by email)
(1) We finished modifying the drawings of the mechanical structure (changed
the locations of the chips and enlarge a bit the heat sinks) today, and I
just sent it to the company (Easton) for verification. Hope to hear back from
them tomorrow.
(2) 8 good cooling tubes which passed the leak test are produced by AIDC and
we will receive them tomorrow.
(3) Promised documentation (1st draft) will be released by Monday. All the
details like test procedures will be included.
Hybrid/T-board - Jianing/Gerard
Action items:
(1) Jianing will change the temperature sensor address on the outer section
Hybrid so that it is different than that on the inner section Hybrid
(2) Gerard and Mike will check the latest hybrid layouts sent by Jianing by
next Tuesday
(3) Jianing and Gerard will start working on T-board 3.0 layout (only 1
temperature sensor, 1 reset circuit, etc). The first will be the circuit
schematics
T-board/Inner Signal Cable - Mike/Gerard
Decision: we will use the IST-type of cables since alternative options seem
to be more expensive according to quotes collected by Mike
Action items:
(1) Gerard will check the T-board 2.1 to make sure it can work for prototype
after some modifications
(2) Gerard will check the latest cable/T-board 2.1 assembly documents sent by
Mike
Module Assembly at Fermilab - Zhenyu
Status: discussion with Fermilab designer and UIC machine shop on going.
Wire-bonding test on whether or not the (0.526,2.6mm) shift is an issue for
wire-bonding will be done later this week/early next week
Simulation
Status: Te-Chuan is working on detailed modeling of FST sub-structures.
Krishan is going to discuss with Daniel this weekend about the new tracking
code
Cooling system - Flemming/Rahul
Gerrit talked to James Kelsey and Jason Bessuille from MIT. They are willing
to service the IST cooling system to make it work again, but asked us to ship
the cooling system to MIT. Because this would lead to additional shipping
costs and make it harder for BNL STSG to take over, it is proposed to request
the MIT engineers to come to BNL for the service work. Gerrit again expressed
concerns with using soft tubes in the cooling system with Novec.
Action item
(1) Elke is going to get into contact with Richard Milner, Redwine
(2) Yi reports the tests he is doing with the compatibility of the soft tubes
with Novec.
(3) BNL tests the compatibility of the soft tube with flowing Novec.
(4) Zhenyu will follow up on the grounding of the cooling system if using
soft (non-conductive) tubes
> On Oct 22, 2019, at 7:56 AM, Zhenyu Ye <yezhenyu2003 AT gmail.com> wrote:
>
> Dear all,
>
> We will have a meeting starting at 9am BNL time this Thursday Oct 24. The
> meeting agenda and bluejeans info can be found at
> https://drupal.star.bnl.gov/STAR/blog/yezhenyu/forward-silicon-tracker-weekly-meeting
>
> 1 Mechanical Structure - Yi Yang, Han-sheng Li
> 2 Hybrid - Jianing Dong
> 3 T-board and Inner Signal Cable - Michael Capotosto
> 4 Module Assembly at Fermilab - Zhenyu Ye
> 5 Simulation - TBD
>
> Best,
> Zhenyu
-
[Star-fst-l] Weekly FST meeting - 10/24/2019,
Zhenyu Ye, 10/22/2019
- Re: [Star-fst-l] Weekly FST meeting - 10/24/2019, Yi Yang, 10/24/2019
-
Re: [Star-fst-l] Weekly FST meeting - 10/24/2019,
Zhenyu Ye, 10/24/2019
- Re: [Star-fst-l] Weekly FST meeting - 10/24/2019, 董家宁, 10/29/2019
Archive powered by MHonArc 2.6.24.