Dear all,

I am very sorry for missing the meeting. Obviously I should not have called
for a remote meeting in the evening of the banquet of a workshop at a
different time zone. Please accept my apology and kindly email your status
reports to the list.

3 Module Assembly at Fermilab - Zhenyu Ye
Fermilab technicians did the wire-bond test with the .58mm shift and did not
have any problem during the first bonding (see the pictures from the link
below). They indicated if we were to do second bonding that there could be a
difficulty, i.e. remove some bonds and redo them. I don’t expect we need to
do second bonding to the front-end pads (we did not do this for IST),
therefore I told them that for the prototypes we will stay with the current
positions, and can change for the production if we would find it is needed
from prototype assembly. They are ok with this.

https://drupal.star.bnl.gov/STAR/event/2019/10/31/star-forward-silicon-tracker-meeting/module-assembly-fermilab

Best,
Zhenyu

> On Oct 31, 2019, at 9:12 PM, Aschenauer Elke-Caroline <elke AT bnl.gov> wrote:
>
> Dear Zhenyu,
>
> we have been waiting 10 min, but after this we decided to call it a day.
>
> Cheers elke
>
>
>> On Oct 30, 2019, at 20:39, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
>>
>> Dear all,
>>
>> Despite the ongoing pre-QM meeting, we will have a meeting this week (Nov
>> 1 Thursday) starting at 9am BNL time. The meeting agenda and bluejeans
>> info can be found at
>> https://drupal.star.bnl.gov/STAR/blog/yezhenyu/forward-silicon-tracker-weekly-meeting
>>
>> 1 Mechanical Structure - Yi Yang, Han-sheng Li
>> 2 Hybrid, T-board and Inner Signal Cable - Jianing Dong, Michael
>> Capotosto, Gerard Visser
>> 3 Module Assembly at Fermilab - Zhenyu Ye
>> 4 Test stand at BNL - Prithwish Tribedy, Yu Hu
>> 5 Simulation - Te-Chuan Huang, Krishan Gopal
>>
>> I hope we can hear the latest status, especially the action items from the
>> last week and tomorrow.
>> https://drupal.star.bnl.gov/STAR/event/2019/10/24/star-forward-silicon-tracker-meeting#comment-1745
>>
>> Best,
>> Zhenyu
>> _______________________________________________
>> Star-fst-l mailing list
>> Star-fst-l AT lists.bnl.gov
>> https://lists.bnl.gov/mailman/listinfo/star-fst-l
>
>
> ( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-
> ) `\ +
> / '. | Elke-Caroline Aschenauer (she/her/hers) =
> | `, -
> \,_ `-/ Brookhaven National Lab +
> ,&&&&&V Physics Dept., 25 Corona Road =
> ,&&&&&&&&: Bldg. 510 /2-195 Rocky Point, NY, -
> ,&&&&&&&&&&; 20 Pennsylvania Avenue 11778 +
> | |&&&&&&&;\ Upton, NY 11973 =
> | | :_) _ Tel.: 001-631-344-4769 Tel.: +1-631-569-4290 -
> | | ;--' | Cell-USA: +1-757-2565224 +
> '--' `-.--. | Cell-Europe: +49152220025211 =
> \_ | |—‘ -
> `-._\__/ Mail: elke AT bnl.gov elke.caroline AT me.com +
>
> +=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
>




Archive powered by MHonArc 2.6.24.

Top of Page