hi Jianing, Zhenyu,
Somebody was going to document (simply with a picture or two) how that the connector tab of outer (particularly) hybrid fits well to the T-board on mechanical structure. I think we should see this before the new outer hybrid is ordered. (Is there any change in this aspect of the new outer hybrid? I understood no change.)
Meanwhile, yes it is in my inbox to check the electrical aspects, I will try to have that done by early next week.
Thanks,

Gerard


On 10/31/2019 10:04 PM, 董家宁 wrote:
Dear All,

  2.Hybrid, T-board:

  With the help of Mike and Gerard,  the address connection for the temperature sensor chip on outer hybrid is modified and updated.

  And the schematic for T-board v3.0 is also updated (keep one set of temperature sensor and reset circuit).

  I think they are all waiting for the double check.

  If there are no other mistakes for outer hybrid layout, it will take about 3 weeks for the production.

  All the detailed status are listed on the WIKI (https://wiki.bnl.gov/star/index.php/Hybrid_and_T-board).


Best,

Jianing


-----原始邮件-----
*发件人:*"Capotosto, Michael" <capotosto AT bnl.gov>
*发送时间:*2019-11-01 05:43:15 (星期五)
*收件人:* "Ye, Zhenyu" <yezhenyu AT uic.edu>, "star-fst-l AT lists.bnl.gov"
<star-fst-l AT lists.bnl.gov>
*抄送:*
*主题:* Re: [Star-fst-l] Weekly FST meeting - 10/31/2019

All,

As discussed last meeting, I’ve compiled the documentation and posted it
to
the wiki: https://wiki.bnl.gov/star/index.php/Cables

T-Board/Inner Signal Cable:

Last meeting we agreed we would use the IST-type of cables, due to cost.
It
turns out I misinterpreted the quote – we were quoted for 400ft of cable
but
they had a minimum 1,000ft order. It is cheaper as Gerard expected to use
the Polypropylene/PVC/PVC cable. I’m waiting to hear back from Gerard on
how
he’d like to proceed. The updated quotes binder mentioned can be found
here:

https://drupal.star.bnl.gov/STAR/system/files/Cable%20Quotes%20Binder%2010-28-2019.pdf

<https://drupal.star.bnl.gov/STAR/system/files/Cable%20Quotes%20Binder%2010-28-2019.pdf>
The quotes binder also includes new updated (non-expired) quotes, so once
we
have a decision we can order the cables. (Elke/Gerard/Zhenyu, will this be
on one of the BNL accounts, or will I be sending this to someone else? If
it
will be on a BNL account I can start drafting the PO so it will be ready
to
send when we make a final decision).

Regarding the V2.1 T-Board modifications, I believe we just need to
remove a
handful of parts to in order to make it work, I’ve discussed this in an
email with Jianing and Gerard, and am waiting to hear back from Gerard. I
will have the cables re-labeled tonight before I leave (to match the VIA
REF
DES used in V2.1 T-Boards we are assembling). Once Gerard gives me the
O.K.
I’ll pull the parts off the boards, and we should be able to give them to
the assembler within a working day or two. If there are no objections, I
will extend the due date for the vendor to November 29.

If I’ve missed any points please let me know.