Minutes

Attendees: Flemming, Jianing, John, Maowu, Prithwish, Rahul, Te-Chuan, Xu,
Zhenyu

Cooling system - Rahul
Bill met Jason during his visit for sPHENIX. Plan to order two pumps,
controller, and leak lock. Will try to replace the pumps and controller, use
leak lock to seal the cooling lines, and put a heat source at the end of the
line and run for a couple of weeks. May be able to do this w/o Jason.
John - what is the size of the cooling soft tube?
Yi - inner diameter 6.35 mm, 3 disks with 4 in and 4 out each

Integration - Rahul
Interviewing new designer

BNL Irradiation facility service - Flemming
still under exploration

Parts for UIC test stand - Flemming
parts are collected by Mike, Flemming prepared paperwork. May take a few more
days to get approvals

Mechanical structures - Yi
The 2nd prototype was finished last Friday. will pick up tomorrow. This 2nd
prototype does not have square hole in the middle of the outer wedge (Zhenyu:
this may introduce a conflict with module assembly fixture at Fermilab. Yi:
will double check. If so, will try to cut it off. May try to make a 3rd
prototype before Friday)
Yi will bring both prototypes to National Taiwan University for optical
survey. May send them to UIC on Friday or next Monday

Storage boxes - Yi
An external company made two storage boxes with acrylic last Friday
Another company is trying to make one using Aluminum. May be able to finish
it next week.

Testing of compatibility of soft tube with NOVEC - Yi
Company will come to NCKU lab on Wednesday to finish the procurement. The
setup should be ready by Friday



> On Feb 6, 2020, at 4:22 PM, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
>
> Dear all,
>
> We will have the Weekly FST meeting on Monday starting at 9am EST (BNL
> local time).
>
> https://drupal.star.bnl.gov/STAR/event/2020/02/10/fst-group-meeting
>
> Bluejeans Meeting URL https://bluejeans.com/101020434
> Meeting ID: 101 020 434
>
> Meeting agenda:
>
> 1. Mechanical structure - Yi/Hansheng
> Status of mechanical structure prototype and assembly
> Thermal simulation and measurement
> Soft cooling tube test
>
> 2. Tracking - Krishan
>
> Best,
> Zhenyu
>
>
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l





Archive powered by MHonArc 2.6.24.

Top of Page