Skip to Content.
Sympa Menu

star-fst-l - Re: [Star-fst-l] Weekly FST meeting, Feb 17 9am

star-fst-l AT lists.bnl.gov

Subject: Star-fst-l mailing list

List archive

Chronological Thread  
  • From: "Ye, Zhenyu" <yezhenyu AT uic.edu>
  • To: "Ye, Zhenyu" <yezhenyu AT uic.edu>
  • Cc: "star-fst-l AT lists.bnl.gov" <star-fst-l AT lists.bnl.gov>
  • Subject: Re: [Star-fst-l] Weekly FST meeting, Feb 17 9am
  • Date: Mon, 17 Feb 2020 15:34:43 +0000

Attendees: Elke, Flemming, Han-Sheng, Jianing, Krishan, Maowu, Te-Chuan, Xu,
Yi, Zhenyu

Mechanical structure - Yi
Two prototype modules measured at NTU. The RMS of the surfaces is around
250-450 microns. The deviation of the distance between the mounting hole and
closest chip pad from its nominal value is 600 microns. They were sent to UIC
and expect to arrive late this week. Plan to look into the possibility to use
NTU bonding machine to glue hybrids onto mechanical structures. Will also ask
AIDC to improve the
Action item: plot X-Y-Z of the data, find out the surface shape and maximum
deviation.
Action item: provide a detailed document of the hybrid gluing and optical
survey procedure for internal comments/review

Tracking and simulation - Krishan/Te-Chuan
Action item: Te-Chuan will check if the FST fast simulator works with the new
FST geometry
Action item: Te-Chuan will transfer his knowledge in running FST simulation
to Xu, Krishan and possibly a new student from NCKU.

Parts for UIC test stand - Flemming
Paperwork done. Expect to ship them out tomorrow or Wednesday

F2F meeting agenda:
Overview by Flemming or Zhenyu
Mechanical structure by Yi
Module assembly by Zhenyu
Cooling, integration by Rahul
Test-stand by Xu

> On Feb 13, 2020, at 3:35 PM, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
>
> Dear all,
>
> We will have the Weekly FST meeting on Monday starting at 9am EST (BNL
> local time).
>
> https://drupal.star.bnl.gov/STAR/event/2020/02/17/fst-group-meeting
>
> Bluejeans Meeting URL https://bluejeans.com/101020434
> Meeting ID: 101 020 434
>
> Meeting agenda:
>
> 1. Mechanical structure - Yi/Hansheng
> Survey results of prototype mechanical structures by vendors and NTU
>
> 2. Tracking studies - Krishan
>
> 3. BNL F2F meeting agenda - all
>
> Zhenyu
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l





Archive powered by MHonArc 2.6.24.

Top of Page