Dear all,

We will have the Weekly FST meeting on Monday starting at 9am EST (BNL local
time).

Bluejeans Meeting URL https://bluejeans.com/101020434
Meeting ID: 101 020 434

https://drupal.star.bnl.gov/STAR/event/2020/05/11/star-forward-silicon-tracker-meeting

Tentative meeting agenda:

0. follow-ups on the action items from last week (see *** below)
1. Integration
by Rahul Sharma/Felix Archampong
2. Hybrid
by Maowu Nie, Jianing Dong
2. Mechanical structure by Yi
Yang
3. Prototype Module Assembly and Test by Xu Sun
4. Tracking Studies by
Krishan Gopal, Daniel Brandenburg
5. Simulation Studies by
Shenghui Zhang

Best,
Zhenyu

*** Action items from previous weeks ***
1) Document the procedure and requirements of gluing hybrids onto MS for Plan
A at NTU - Yi/Han-Sheng
2) Document the procedure and requirements of gluing hybrids onto MS for Plan
B by AIDC. This is needed before new hybrid production - Yi/Han-Sheng
3) Document on how/where the company would measure the surface flatness and
being parallel between inner-outer sectors, before and after glueing hybrids
and inner-outer sectors together - Yi/Han-Sheng
4) Look into radiation tolerance test of cooling soft tubes at
BNL/STAR/Taiwan - Flemming/Yi
5) Find out how the company would fix the hybrid and measure its flatness and
thickness - Maowu/Jianing
6) UIC send a T-board and cable to NCKU to check if there is any conflict
with the MS - Zhenyu
7) Fermilab reopening plan - Zhenyu
8) Looking into alternative clustering algorithm to improve matching
efficiency - Xu
9) Tune the timing setting for ADC sampling - Gerard/Xu
10) Studying the tracking performance by varying the Z-locations of FST
disks, and number of r/phi segments - Krishan/Daniel
11) Looking into FST simulation and track reconstruction with Te-Chuan and
Daniel’s code/instruction - Shenghui
12) List of future orders:

Sensors - August 2020 by BNL (Flemming/Zhenyu)
Hybrids - August 2020 by SDU (Jianing)
T-boards - August 2020 by SDU (Jianing)
Mechanical structures - August 2020 by NCKU (Yi)
Connectors for hybrids and T-boards - August 2020 by BNL (Mike/Flemming)
Parts for supporting structure and installation tool - September 2020 by BNL
(Rahul)
Cooling soft plastic by NCKU, or metal tubes by BNL?