star-fst-l AT lists.bnl.gov
Subject: Star-fst-l mailing list
List archive
[Star-fst-l] Presentation on FST simulation studies at forward upgrade meeting
- From: "Ye, Zhenyu" <yezhenyu AT uic.edu>
- To: "star-fst-l AT lists.bnl.gov" <star-fst-l AT lists.bnl.gov>
- Subject: [Star-fst-l] Presentation on FST simulation studies at forward upgrade meeting
- Date: Tue, 2 Jun 2020 14:26:36 +0000
Krishan, Shenghui, please see a request from Elke on presentation of FST simulation studies at the forward upgrade meeting in two weeks from now. I suggest that each of you prepare and present slides on the topic you are studying. It would be helpful to have the slides sent and discussed within the FST group beforehand.
Daniel, I consider the Z-location study has already been presented to the forward upgrade group and thus not include it here. But let me know if you have some updates that you would also like to present.
Thanks,
Zhenyu
Begin forwarded message:
From: Aschenauer Elke-Caroline via Star-fwd-upgrade-l <star-fwd-upgrade-l AT lists.bnl.gov>
Subject: [Star-fwd-upgrade-l] recap of today meetings
Date: June 2, 2020 at 9:05:55 AM CDT
To: Aschenauer Elke-Caroline via Star-fwd-upgrade-l <star-fwd-upgrade-l AT lists.bnl.gov>
Reply-To: Aschenauer Elke-Caroline <elke AT bnl.gov>, star-fwd-upgrade-l AT lists.bnl.gov
Dear All,_______________________________________________
Silicon- sent slides describing the shutdown work to the list- give a presentation summarizing all the simulation studies in a 2 weeks time
sTGC:- sent slides describing the shutdown work to the list- need to discuss the pro's and con’s of doing the prototype with beam to understand how much we need to push to install the heating tape before the run
FCS:- need to find package with polishing machine for Valpo at BNL
Talks for next week:- slow control show and tell by Paul
Please sent any news to the listthanks elke
( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-) `\ +/ '. | Elke-Caroline Aschenauer (she/her/hers) =| `, -\,_ `-/ Brookhaven National Lab +,&&&&&V Physics Dept., 25 Corona Road =,&&&&&&&&: Bldg. 510 /2-195 Rocky Point, NY, -,&&&&&&&&&&; 20 Pennsylvania Avenue 11778 +| |&&&&&&&;\ Upton, NY 11973 =| | :_) _ Tel.: 001-631-344-4769 Tel.: +1-631-569-4290 -| | ;--' | Cell-USA: +1-757-2565224 +'--' `-.--. | Cell-Europe: +49152220025211 =\_ | |—‘ -`-._\__/ Mail: elke AT bnl.gov elke.caroline AT me.com ++=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
Star-fwd-upgrade-l mailing list
Star-fwd-upgrade-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fwd-upgrade-l
-
[Star-fst-l] Presentation on FST simulation studies at forward upgrade meeting,
Ye, Zhenyu, 06/02/2020
-
Re: [Star-fst-l] Presentation on FST simulation studies at forward upgrade meeting,
krishan, 06/04/2020
-
Re: [Star-fst-l] Presentation on FST simulation studies at forward upgrade meeting,
Aschenauer Elke-Caroline, 06/04/2020
- Re: [Star-fst-l] Presentation on FST simulation studies at forward upgrade meeting, krishan, 06/04/2020
-
Re: [Star-fst-l] Presentation on FST simulation studies at forward upgrade meeting,
Aschenauer Elke-Caroline, 06/04/2020
-
Re: [Star-fst-l] Presentation on FST simulation studies at forward upgrade meeting,
krishan, 06/04/2020
Archive powered by MHonArc 2.6.24.