Hi Zhenyu,

Thanks for informing us about the plan. I am having difficulty in running tracking code in my local system. It is showing very strange time distribution for different hijing files (from ~55 min to ~4 hours /25 events even sometime ~8 hour). I could not find the reason. I informed about it to Daniel yesterday. Once the issue is fixed I will be able to do the simulation faster.

Best regards,
Krishan


On 2020-06-02 10:26, Ye, Zhenyu wrote:
Krishan, Shenghui, please see a request from Elke on presentation of
FST simulation studies at the forward upgrade meeting in two weeks
from now. I suggest that each of you prepare and present slides on the
topic you are studying. It would be helpful to have the slides sent
and discussed within the FST group beforehand.

Daniel, I consider the Z-location study has already been presented to
the forward upgrade group and thus not include it here. But let me
know if you have some updates that you would also like to present.

Thanks,
Zhenyu

Begin forwarded message:
From: Aschenauer Elke-Caroline via Star-fwd-upgrade-l
<star-fwd-upgrade-l AT lists.bnl.gov>

Subject: [Star-fwd-upgrade-l] recap of today meetings

Date: June 2, 2020 at 9:05:55 AM CDT

To: Aschenauer Elke-Caroline via Star-fwd-upgrade-l
<star-fwd-upgrade-l AT lists.bnl.gov>

Reply-To: Aschenauer Elke-Caroline <elke AT bnl.gov>,
star-fwd-upgrade-l AT lists.bnl.gov

Dear All,

Silicon
- sent slides describing the shutdown work to the list
- give a presentation summarizing all the simulation studies in a 2
weeks time

sTGC:
- sent slides describing the shutdown work to the list
- need to discuss the pro's and con’s of doing the prototype with
beam to understand how much we need to push to install the heating
tape before the run

FCS:
- need to find package with polishing machine for Valpo at BNL

Talks for next week:
- slow control show and tell by Paul

Please sent any news to the list
thanks elke

( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-

) `\ +
/ '. | Elke-Caroline Aschenauer (she/her/hers) =
| `, -
\,_ `-/ Brookhaven National Lab +
,&&&&&V Physics Dept., 25 Corona Road =

,&&&&&&&&: Bldg. 510 /2-195 Rocky Point, NY,
-
,&&&&&&&&&&; 20 Pennsylvania Avenue 11778
+
| |&&&&&&&;\ Upton, NY 11973
=
| | :_) _ Tel.: 001-631-344-4769 Tel.: +1-631-569-4290
-
| | ;--' | Cell-USA:
+1-757-2565224 +
'--' `-.--. | Cell-Europe:
+49152220025211 =
\_ | |—‘
-

`-._\__/ Mail: elke AT bnl.gov elke.caroline AT me.com
+

+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=

_______________________________________________
Star-fwd-upgrade-l mailing list
Star-fwd-upgrade-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fwd-upgrade-l
_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l




Archive powered by MHonArc 2.6.24.

Top of Page