Hi Yi,
You can find a picture of the tool on slide 11
https://drupal.star.bnl.gov/STAR/system/files/FSTPrototypeModuleTest.pdf
A main reason we chose this tool is because of its L shape, which allowed us
to access the connector while the module is in the storage box, so that the
space between the connector and the storage box wall is very limited (see
slide 2). I don’t think you have such a limitation since the readout chip or
sensor is not mounted so that you don’t need to place the module inside the
storage box.
Zhenyu
> On Jun 2, 2020, at 11:16 PM, Yi Yang <yiyang AT ncku.edu.tw> wrote:
>
> Hi Maowu,
>
> I just received the connectors, thanks a lot.
>
> Hi Zhenyu,
>
> We will conduct the plug and unplug test before mounting the components.
> Could you please show me the tool you used before? Thanks a lot.
>
> Cheers,
> Yi
>
> +++++++++++++++++++++++++++++++++++++++++++++++++++
> Yi Yang, Associate Professor
> Department of Physics
> National Cheng Kung University
> Tainan, 701 Taiwan
> E-Mail: yiyang AT ncku.edu.tw
> Tel: +886-6-2757575 ext.65237
> Fax: +886-6-2747995
> Group Web:
> https://urldefense.com/v3/__http://phys.ncku.edu.tw/*yiyang__;fg!!P4SdNyxKAPE!U5seqUFSPDxdpforlnt3KisEKNnC3lnBzu1zq44fzy74KkVw_1s3c9VyeQpKkOf-NUyPzu0$
>
> +++++++++++++++++++++++++++++++++++++++++++++++++++
>
>
> On Thu, May 28, 2020 at 12:33 PM nie <nie AT rcf.rhic.bnl.gov> wrote:
> Hi Yi,
>
> We just sent two female connectors for T-board to you. The DHL tracking
> number is 1135665226.
>
> Regards,
> Maowu & Jianing
>
>
> 在 2020-05-28 09:21,Yi Yang 写道:
> > Dear Mike,
> >
> > Sorry for the delayed reply and thanks a lot for offering to send them
> > to us.
> > I think we can wait for one or two days and see the status of
> > Jianing's shipment. If it really got stuck at customs, I will let you
> > know.
> >
> > Cheers,
> > Yi
> >
> > +++++++++++++++++++++++++++++++++++++++++++++++++++
> > Yi Yang, Associate Professor
> > Department of Physics
> > National Cheng Kung University
> > Tainan, 701 Taiwan
> > E-Mail: yiyang AT ncku.edu.tw
> > Tel: +886-6-2757575 ext.65237
> > Fax: +886-6-2747995
> > Group Web:
> > https://urldefense.com/v3/__http://phys.ncku.edu.tw/*yiyang__;fg!!P4SdNyxKAPE!U5seqUFSPDxdpforlnt3KisEKNnC3lnBzu1zq44fzy74KkVw_1s3c9VyeQpKkOf-NUyPzu0$
> > [4]
> > +++++++++++++++++++++++++++++++++++++++++++++++++++
> >
> > On Wed, May 27, 2020 at 7:05 PM Capotosto, Michael <capotosto AT bnl.gov>
> > wrote:
> >
> >> Hey Yi, Zhenyu,
> >>
> >> I do believe that we have a handful of spare male connectors from
> >> the V2.1 T-Boards at BNL (I believe these just have a different
> >> jackscrew/captive screw). Would these work for your tests? I have to
> >> head in to the lab today, if you’d like I can package and drop off
> >> a few of these with shipping and receiving. I’m not sure if
> >> they’d reach you any quicker.
> >>
> >> --Mike Capotosto
> >>
> >> From: Star-fst-l <star-fst-l-bounces AT lists.bnl.gov> On Behalf Of Yi
> >> Yang
> >> Sent: Tuesday, May 26, 2020 11:59 PM
> >> To: Ye, Zhenyu <yezhenyu AT uic.edu>
> >> Cc: star-fst-l AT lists.bnl.gov
> >> Subject: Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time)
> >>
> >> Hi Zhenyu,
> >>
> >> Regarding the "5) Will do electrical tests after the connector is
> >> soldered onto the hybrid. Zhenyu recommends to do it after plugging
> >> and unplugging the male connectors to make sure the soldering is
> >> robust. Yi is not sure if he has male connectors. Maowu will check
> >> if SDU has male connectors and if so send to Yi"
> >>
> >> Two sets of hybrids are passed the electrical tests today.
> >>
> >> Jianing confirmed that I did send all my male connectors to her
> >> before and she is going to send 2 connectors to me today.
> >>
> >> However, it might take several days to weeks to receive them (I am
> >> not 100% sure whether we will have to wait for 14 days to receive
> >> the package from China now). And we are planning to mount the
> >> connector on the MS in the end of this week.
> >>
> >> So, I would propose to skip the plugging and unplugging test for
> >> these prototypes since I think you want to test the inner sensor
> >> asap. What do you think?
> >>
> >> Cheers,
> >>
> >> Yi
> >>
> >> +++++++++++++++++++++++++++++++++++++++++++++++++++
> >> Yi Yang, Associate Professor
> >> Department of Physics
> >> National Cheng Kung University
> >> Tainan, 701 Taiwan
> >> E-Mail: yiyang AT ncku.edu.tw
> >> Tel: +886-6-2757575 ext.65237
> >> Fax: +886-6-2747995
> >> Group Web:
> >> https://urldefense.com/v3/__http://phys.ncku.edu.tw/*yiyang__;fg!!P4SdNyxKAPE!U5seqUFSPDxdpforlnt3KisEKNnC3lnBzu1zq44fzy74KkVw_1s3c9VyeQpKkOf-NUyPzu0$
> >> [3]
> >> +++++++++++++++++++++++++++++++++++++++++++++++++++
> >>
> >> On Tue, May 26, 2020 at 1:43 AM Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
> >>
> >>
> >>> Felix, Krishan, Han-Sheng, Maowu, Pu-Kai, Shenghui, Te-Chuan, Xu,
> >>> Yi, Zhenyu
> >>>
> >>> 1. Follow-up on action items from previous weeks
> >>> 1) Integration: send an email with detailed questions to the list
> >>> to collect information - Rahul/Felix
> >>> 2) Document the procedure and requirements of gluing hybrids onto
> >>> MS for Plan A at NTU - Yi/Han-Sheng
> >>> -> the procedure is almost determined. will have the document
> >>> ready next week
> >>> 3) Look into radiation tolerance test of soft cooling tubes at
> >>> STAR/Taiwan - Flemming/Yi
> >>> -> tubes are being exposed to radiation. The total doses would be
> >>> 1x and 5x of the ones in the proposal. Will repeat the measurement
> >>> with NOVEC at NCKU after radiation.
> >>> 4) Measuring hybrid flatness, thickness and dimensions -
> >>> Maowu/Jianing
> >>> -> see below
> >>> 5)) UIC send a T-board and cable to NCKU to check if there is any
> >>> conflict with the MS - Zhenyu
> >>> 6) Looking into alternative clustering algorithm to improve
> >>> matching efficiency - Xu
> >>> 7) Tune the timing setting for ADC sampling - Gerard/Xu
> >>> -> see below
> >>> 8) Studying the tracking performance by varying the Z-locations of
> >>> FST disks, and number of r/phi segments - Daniel/Krishan
> >>> -> see below
> >>> 9) Looking into FST simulation and track reconstruction to compare
> >>> 300 vs 500 micron thick sensors - Shenghui
> >>>
> >>> 2. Integration - Felix
> >>> Working on changing the Z-locations of FST disks
> >>>
> >>> 3. Simulation - Krishan
> >>> Has obtained momentum resolution, but it is different than
> >>> Daniel’s. Will check with Daniel. Have results for different
> >>> numbers of r- and phi-segments.
> >>>
> >>> 4. Hybrid - Maowu
> >>> 1) Measured the flatness of two sets of hybrids (1 from old and 1
> >>> from new vendor). The maximum deviation of thickness is less than
> >>> 18 (7) microns for old (new) vendor.
> >>> 2) Measured relative positions of bonding pads w.r.t. the center
> >>> of VIA-A, which would be used as one of the two reference points
> >>> on the hybrid when gluing the hybrid onto the mechanical
> >>> structure. The shifts from the design in the direction
> >>> perpendicular to wire-bond are between (+20, +60) microns.
> >>> * Action item - Maowu: add the absolute differences in the excel
> >>> file. Find out the design value of the distance between the two
> >>> reference VIAs on the hybrids.
> >>> * Action item - question for Yi: There are two VIAs that would be
> >>> used as reference points on the hybrid when gluing the hybrid onto
> >>> the mechanical structure. The rotation is determined by the line
> >>> connecting the centers of the two vias. Which point will be used
> >>> to determine the position of the hybrid?
> >>>
> >>> 5. Prototype module test - Xu
> >>> Has found and used the code to tune the setting for ADC timing for
> >>> FST. Will check with Gerard about the results
> >>>
> >>> Mechanical structure - Yi
> >>> 1) glued one hybrid onto MS. Good in general by eye. There are a
> >>> few places that need to improve. Will try to address them and
> >>> start gluing hybrids onto a good MS this Thursday/Friday, and glue
> >>> the inner/outer sections together.
> >>> 2) Will measure the distance between the centers of the two
> >>> reference VIAs on the hybrid and compare to the design values from
> >>> Maowu. Will measure the relative positions of the two reference
> >>> VIAs w.r.t. pins in the MS.
> >>> 4) Will measure the surface flatness of the MS before and after
> >>> gluing the hybrids
> >>> 5) Will do electrical tests after the connector is soldered onto
> >>> the hybrid. Zhenyu recommends to do it after plugging and
> >>> unplugging the male connectors to make sure the soldering is
> >>> robust. Yi is not sure if he has male connectors. Maowu will check
> >>> if SDU has male connectors and if so send to Yi
> >>>
> >>> *** Action items ***
> >>> 1) Integration: send an email with detailed questions to the list
> >>> to collect information - Rahul/Felix
> >>> 2) Document the procedure and requirements of gluing hybrids onto
> >>> MS for Plan A at NTU - Yi/Han-Sheng
> >>> 3) Look into radiation tolerance test of soft cooling tubes at
> >>> STAR/Taiwan - Flemming/Yi
> >>> 4) Measuring hybrid flatness, thickness and dimensions -
> >>> Maowu/Jianing
> >>> 5)) UIC send a T-board and cable to NCKU to check if there is any
> >>> conflict with the MS - Zhenyu
> >>> 6) Looking into alternative clustering algorithm to improve
> >>> matching efficiency - Xu
> >>> 7) Tune the timing setting for ADC sampling - Gerard/Xu
> >>> 8) Studying the tracking performance by varying the Z-locations of
> >>> FST disks, and number of r/phi segments - Daniel/Krishan
> >>> 9) Looking into FST simulation and track reconstruction to compare
> >>> 300 vs 500 micron thick sensors - Shenghui
> >>>
> >>>> On May 21, 2020, at 10:07 PM, Ye, Zhenyu <yezhenyu AT uic.edu>
> >>> wrote:
> >>>>
> >>>> Dear all,
> >>>>
> >>>> We will have the Weekly FST meeting on Monday starting at 9am
> >>> EST (BNL local time).
> >>>>
> >>>> Bluejeans Meeting URL https://bluejeans.com/101020434 [1]
> >>>> Meeting ID: 101 020 434
> >>>>
> >>>>
> >>>
> >>
> > https://drupal.star.bnl.gov/STAR/event/2020/05/25/star-forward-silicon-tracker-meeting
> >>> [2]
> >>>>
> >>>> Tentative meeting agenda:
> >>>>
> >>>> 0. follow-ups on the action items from last week (see *** below)
> >>>> 1. Testing Prototype at STAR During Shutdown by
> >>> Flemming Videbaek
> >>>> 2. Tracking Studies
> >>> by Daniel Brandenburg, Krishan Gopal
> >>>> 3. Integration
> >>> by Rahul Sharma, Felix Archampong
> >>>> 4. Hybrid
> >>> by Maowu Nie, Jianing Dong
> >>>> 5. Mechanical structure
> >>> by Yi Yang
> >>>> 6. Prototype Module Test
> >>> by Xu Sun
> >>>> 7. Simulation Studies
> >>> by Shenghui Zhang
> >>>>
> >>>> *** Action items from previous weeks ***
> >>>>
> >>>> 1) Integration: send an email with detailed questions to the
> >>> list to collect information - Rahul/Felix
> >>>> 2) Document the procedure and requirements of gluing hybrids
> >>> onto MS for Plan A at NTU - Yi/Han-Sheng
> >>>> 3) Look into radiation tolerance test of soft cooling tubes at
> >>> STAR/Taiwan - Flemming/Yi
> >>>> 4) Measuring hybrid flatness, thickness and dimensions -
> >>> Maowu/Jianing
> >>>> 5)) UIC send a T-board and cable to NCKU to check if there is
> >>> any conflict with the MS - Zhenyu
> >>>> 6) Looking into alternative clustering algorithm to improve
> >>> matching efficiency - Xu
> >>>> 7) Tune the timing setting for ADC sampling - Gerard/Xu
> >>>> 8) Studying the tracking performance by varying the Z-locations
> >>> of FST disks, and number of r/phi segments - Daniel/Krishan
> >>>> 9) Looking into FST simulation and track reconstruction to
> >>> compare 300 vs 500 micron thick sensors - Shenghui
> >>>> _______________________________________________
> >>>> Star-fst-l mailing list
> >>>> Star-fst-l AT lists.bnl.gov
> >>>> https://lists.bnl.gov/mailman/listinfo/star-fst-l
> >>>
> >>> _______________________________________________
> >>> Star-fst-l mailing list
> >>> Star-fst-l AT lists.bnl.gov
> >>> https://lists.bnl.gov/mailman/listinfo/star-fst-l
> >
> >
> > Links:
> > ------
> > [1] https://bluejeans.com/101020434
> > [2]
> > https://drupal.star.bnl.gov/STAR/event/2020/05/25/star-forward-silicon-tracker-meeting
> > [3]
> > https://urldefense.com/v3/__http:/phys.ncku.edu.tw/*yiyang__;fg!!P4SdNyxKAPE!Xxy4X2D2uwYlZtNKy700r-SN4bZk8Lq_fsti-7L-iqUsp2clouGrv-IQj40Kp3V_S4xfkCo$
> > [4]
> > https://urldefense.com/v3/__http://phys.ncku.edu.tw/*yiyang__;fg!!P4SdNyxKAPE!TKVc5pxbO31n6RDpiwIXouXYoZ-hSq721kiCsvMzjFgSHDeaWR8ZfwgUnelsEU_pfIHhQRU$
> > _______________________________________________
> > Star-fst-l mailing list
> > Star-fst-l AT lists.bnl.gov
> > https://lists.bnl.gov/mailman/listinfo/star-fst-l
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l
-