star-fst-l AT lists.bnl.gov
Subject: Star-fst-l mailing list
List archive
Re: [Star-fst-l] Weekly FST meeting, June 22 9am (BNL time)
- From: Yi Yang <yiyang AT ncku.edu.tw>
- To: "Ye, Zhenyu" <yezhenyu AT uic.edu>
- Cc: "star-fst-l AT lists.bnl.gov" <star-fst-l AT lists.bnl.gov>
- Subject: Re: [Star-fst-l] Weekly FST meeting, June 22 9am (BNL time)
- Date: Mon, 22 Jun 2020 15:38:03 +0800
Hi Zhenyu,
My computer is broken (fell from the desk during my lecture) and it probably will take 1 or 2 weeks to be fixed (since we will have a long weekend this week from Thursday to Sunday in Taiwan). I only can use my iPad/iPhone to connect to the meeting in the next two weeks, but I don't know how good it is...
Cheers,
Yi
+++++++++++++++++++++++++++++++++++++++++++++++++++
Yi Yang, Associate Professor
Department of Physics
National Cheng Kung University
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web: http://phys.ncku.edu.tw/~yiyang
+++++++++++++++++++++++++++++++++++++++++++++++++++
Yi Yang, Associate Professor
Department of Physics
National Cheng Kung University
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web: http://phys.ncku.edu.tw/~yiyang
+++++++++++++++++++++++++++++++++++++++++++++++++++
On Sat, Jun 20, 2020 at 4:57 AM Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
Dear all,
We will have the Weekly FST meeting on Monday starting at 9am EST (BNL local time).
Bluejeans Meeting URL https://bluejeans.com/101020434
Meeting ID: 101 020 434
https://drupal.star.bnl.gov/STAR/event/2020/06/22/star-forward-silicon-tracker-meeting
Tentative meeting agenda:
0. follow-ups on the action items from last week (see *** below)
1. Integration by Rahul Sharma, Felix Archampong
2. Tracking Studies by Daniel Brandenburg, Krishan Gopal
3. Simulation Studies by Shenghui Zhang
4. Prototype Module Test by Xu Sun
5. Mechanical structure by Yi Yang
*** Action items from previous weeks ***
1) Design light-tight box for the DAQ integration test at BNL - Rahul/Xu
2) Discuss how to mount modules onto the half-rings, and half-rings onto support structure - Rahul/Yi
3) Document the procedure and requirements of gluing hybrids onto MS for Plan A at NTU - Yi
4) Look into radiation tolerance test of soft cooling tubes at STAR/Taiwan - Yi
5) BNL send a T-board and cable assembly to NCKU to check if there is any conflict with the MS - Mike
6) Looking into alternative clustering algorithm to improve matching efficiency - Xu/Zhenyu
7) Tune the timing setting for ADC sampling - Xu/Gerard
8) Studying the tracking performance by varying the Z-locations of FST disks, and number of r/phi segments - Daniel/Krishan
9) Looking into FST simulation and track reconstruction to compare 300 vs 500 micron thick sensors - Shenghui
10) Post code that used to analyze the simulation data and Flemming will take a look - Shenghui/Flemming
_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l
-
[Star-fst-l] Weekly FST meeting, June 22 9am (BNL time),
Ye, Zhenyu, 06/19/2020
- Re: [Star-fst-l] Weekly FST meeting, June 22 9am (BNL time), Yi Yang, 06/22/2020
- Re: [Star-fst-l] Weekly FST meeting, June 22 9am (BNL time), Ye, Zhenyu, 06/22/2020
Archive powered by MHonArc 2.6.24.