star-fst-l - Re: [Star-fst-l] Weekly FST meeting, July 27 9am (BNL time) - preparer for production readiness review

star-fst-l AT lists.bnl.gov

Subject: Star-fst-l mailing list

List archive

Chronological Thread  
  • From: Yi Yang <yiyang AT ncku.edu.tw>
  • To: "Ye, Zhenyu" <yezhenyu AT uic.edu>
  • Cc: "star-fst-l AT lists.bnl.gov" <star-fst-l AT lists.bnl.gov>
  • Subject: Re: [Star-fst-l] Weekly FST meeting, July 27 9am (BNL time) - preparer for production readiness review
  • Date: Tue, 28 Jul 2020 07:15:57 +0800

Hi all,

My daughter was in hospital for 6 hours last night and we got back home extremely late. Can we review my talk after today’s forward meeting? Sorry about that.

Cheers,
Yi

Ye, Zhenyu <yezhenyu AT uic.edu>於 2020年7月23日 週四,上午12:07寫道:
Dear all

We will use the next FST meeting to discuss/prepare for the production readiness review on August 3.

The agenda for the review can be found in Flemming’s email and also attached below. I would like to ask all the speakers to have the first version of the slides ready before the meeting, so that we go through them quickly at the meeting. We shall also use this opportunity to clarify what the charge of the review is and what we should/not include in the presentation, and what other materials we should provide to the reviewers.

The meeting will start at the usual time, i.e., Monday 9am EST (BNL local time).

Bluejeans Meeting URL https://bluejeans.com/101020434
Meeting ID: 101 020 434

https://drupal.star.bnl.gov/STAR/event/2020/07/27/star-forward-silicon-tracker-meeting

Introduction -> Zhenyu Ye (15’)     
        Detector requirements       
        Design concepts 

Module Mechanical Structure -> Yi Yang  (25’)     
        Mechanical sector production     
        Assembly     
        Tests and QA

Hybrid production and QC –> Maowu (15’)

Module Assembly and Testing - Xu Sun  (25’)     
        Module assembly at FNAL     
        Tests and QA at UIC (procedures)     
        Performance from the tests         

  Mechanical integration -> Rahul Sharma  (25’)     
        Requirements,     
        Design       
                Support structures         
                Detector support interface     
        Cooling system   

 Summary and Outlook - Flemming Videbaek  (25’)
        Electronics, DAQ and Slow Control     
        Schedule, Milestones, Resources

Best,
Zhenyu

_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l
--
+++++++++++++++++++++++++++++++++++++++++++++++++++
Yi Yang, Associate Professor
Department of Physics
National Cheng Kung University
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web: http://phys.ncku.edu.tw/~yiyang
+++++++++++++++++++++++++++++++++++++++++++++++++++



Archive powered by MHonArc 2.6.24.

Top of Page