star-fst-l - [Star-fst-l] Weekly FST meeting, July 27 9am (BNL time) - preparer for production readiness review

star-fst-l AT lists.bnl.gov

Subject: Star-fst-l mailing list

List archive

Chronological Thread  
  • From: "Ye, Zhenyu" <yezhenyu AT uic.edu>
  • To: "star-fst-l AT lists.bnl.gov" <star-fst-l AT lists.bnl.gov>
  • Subject: [Star-fst-l] Weekly FST meeting, July 27 9am (BNL time) - preparer for production readiness review
  • Date: Wed, 22 Jul 2020 16:07:41 +0000

Dear all

We will use the next FST meeting to discuss/prepare for the production
readiness review on August 3.

The agenda for the review can be found in Flemming’s email and also attached
below. I would like to ask all the speakers to have the first version of the
slides ready before the meeting, so that we go through them quickly at the
meeting. We shall also use this opportunity to clarify what the charge of the
review is and what we should/not include in the presentation, and what other
materials we should provide to the reviewers.

The meeting will start at the usual time, i.e., Monday 9am EST (BNL local
time).

Bluejeans Meeting URL https://bluejeans.com/101020434
Meeting ID: 101 020 434

https://drupal.star.bnl.gov/STAR/event/2020/07/27/star-forward-silicon-tracker-meeting

Introduction -> Zhenyu Ye (15’)
Detector requirements
Design concepts

Module Mechanical Structure -> Yi Yang (25’)
Mechanical sector production
Assembly
Tests and QA

Hybrid production and QC –> Maowu (15’)

Module Assembly and Testing - Xu Sun (25’)
Module assembly at FNAL
Tests and QA at UIC (procedures)
Performance from the tests

Mechanical integration -> Rahul Sharma (25’)
Requirements,
Design
Support structures
Detector support interface
Cooling system

Summary and Outlook - Flemming Videbaek (25’)
Electronics, DAQ and Slow Control
Schedule, Milestones, Resources

Best,
Zhenyu