HI Zhenyu,

Agree, it is a good plan.

Cheers,
Yi

+++++++++++++++++++++++++++++++++++++++++++++++++++
Yi Yang, Associate Professor
Department of Physics
National Cheng Kung University
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web: http://phys.ncku.edu.tw/~yiyang
+++++++++++++++++++++++++++++++++++++++++++++++++++


On Tue, Jul 21, 2020 at 11:03 PM Zhenyu Ye <yezhenyu2003 AT gmail.com> wrote:
Hi Flemming

Thanks for the organizing the review. Since the review will take place in slightly less than 2 weeks from now, I propose that we devote the next week’s FST meeting to the preparation and discussion for the review. I would like to suggest everyone to make their first version of the slides before the meeting, and we try to go through them quickly at the meeting and clarify anything that is unclear for the review (what the charge is, what we should and should not include in the presentation), and what other materials we should provide to the reviewers.

Best,
Zhenyu

> On Jul 19, 2020, at 2:47 PM, videbaek <videbaek AT bnl.gov> wrote:
>
> Hi,
>
> There had to be some additional joggling with dates due to people's availability; It seems the review is settled fo Monday 8/3. The reviewers will be, all from BNL
>
> Jim Stewart
> Jim Mills
> Gerrit van Nieuwenhuizen
> Paul o’Connor
> Grezgor  Deptuch
>
> And the proposed agenda
> Introduction -> Zhenyu Ye (15’)     
>  Detector requirements       
> Design concepts  Module
>
> Mechanical production -> Yi Yang  (25’)     
> Hybrids     
> Mechanical sector production     
> Assembly     
> Tests and QA
>
> Hybrid production and QC – Maowu (15’)
> Prototype module assembly and performance
> - Xu Sun  (25’)     
> Module assembly at FNAL     
> Tests and QA at UIC (procedures)     
> Performance from the tests         
> Performance in simulation based on the measured response
>   Mechanical integration -> Rahul Sharma  (25’)     
> Requirements,     
> Design       
>  Support structures         
> Detector support interface     
> Cooling system   
>  ->  Summary and Outlook - Flemming Videbaek  (25’) 
>        Electronics, DAQ and Slow Control     
> Schedule, Milestones, Resources
>
>
> We will discuss this more at tomorrows meeting
> best Flemming
>
> --
> Flemming Videbaek
> senior scientist
> videbaek @ bnl.gov
> Brookhaven National Lab
> Physics Department
> Bldg 510D
> Upton, NY 11973
>
> phone: 631-344-4106
> cell     :  631-681-1596
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l

_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l



Archive powered by MHonArc 2.6.24.

Top of Page