Hi Bill, Thanks for the useful info.
Flemming/Rahul said they found a box made of thick plastics. I am not sure if
it is the one than that you mentioned below. If yes, that will be a big
coincidence. Flemming/Rahul, please follow up with Stephen if you would like
to explore this option.
Zhenyu
> On Aug 17, 2020, at 10:03 AM, Christie, William <christie AT bnl.gov> wrote:
>
> Hi Zhenyu,
> I don't know what dimensions you need, nor whether it still exists
> (I've cc'd Stephen Trentalange) but Stephen constructed a light tight box
> for testing associated with the FMS. He used it in the Clean room out at
> STAR. It had light baffled holes for cooling (maybe even integrated fans),
> ports to get cables in and out, etc. If it is still around it may meet your
> needs for item 1 under integration.
> Greetings,
> Bill
>
> On 8/17/20, 10:41, "Star-fst-l on behalf of Ye, Zhenyu"
> <star-fst-l-bounces AT lists.bnl.gov on behalf of yezhenyu AT uic.edu> wrote:
>
> Minutes:
>
> Integration:
> 1) Design and fabricate light-tight box for the DAQ integration test at
> BNL - Rahul/Flemming
> -> Found a dark Box made of thick plastics. Will drill holes for cables
> and decide how to fix the FST storage box in Nov.
> 2) Design the cooling lines, and cable trays between disks and cooling
> manifold - Felix/Rahul
> -> Expect a presentation next week.
> 3) Cooling rack refurbishment and test - Rahul
> -> Flew NOVEC last Monday, but the system started tripping on Tuesday
> but no interlock dropped. Will investigate.
>
> Mechanical structure:
> 1) Document the proposed changes to the mechanical structure - Yi
> -> Will do this week
> 2) Test and examine the new assembly procedure - Yi
> -> New jigs needed some changes. Done last Friday. May have the results
> this week
>
> Hybrid/T-board/Inner Signal Cable/Patch Panel Board/Back of Crate Board:
> 2) Check how T-board would mount onto MS, and fix cables -
> Jianing/Maowu/Mike/Gerard
> -> Rahul/Felix will give a presentation on cable fixing next week. Will
> decide whether to keep or remove the four cable-tie holes on the T-board
> -> Maowu will follow up with Yi to see how to change the holes on the
> corners of the T-board to slots
>
> Production Module assembly:
> 1) Get updated quote from Hamamatsu - Zhenyu
> -> Done. Hamamatsu final quote and spec for production sensors.
> -> Flemming: request has been submitted to BNL procurement.
> -> Elke: Don't see why the order can not be placed this Month. Need
> constant follow-up
>
> 2) Discuss with Fermilab about production module assembly schedule -
> Zhenyu/Xu
> -> Zhenyu will provide the contact person info to Elke so that she can
> ask for and understand the spendings on prototypes, and estimates for the
> production
>
> Prototype Module test:
> 1) Gavin: compared different hit reconstruction threshold and time bin
> requirements using data taking with FST03 (both inner and outer). Found
> consistent results as FST01 (outer sensor only)
>
> Software:
> 1) Develop FST slow simulator to study tracking performance -
> Gavin/Shenghui/Daniel
> -> Shenghui: no statistically significant difference in pT resolution
> between fast and slow simulators. Will further check.
> 2) Prepare FST fast simulator code for Review - Shenghui
> -> Done.
>
> **** Action items ****
> Integration:
> 1) Design the cooling lines, and cable trays between disks and cooling
> manifold - Felix/Rahul
> 2) Cooling rack refurbishment and test - Rahul
> 3) Installation procedure and tolerance requirements - Rahul/Yi/Zhenyu
> 4) Survey procedure and requirements - Rahul
> 5) Prepare documents for prelim safety review with C-AD - all
>
> Mechanical structure:
> 1) Document the proposed changes to the mechanical structure - Yi
> 2) Test and examine the new assembly procedure - Yi
> 3) Use thermal camera to check air bubbles for hybrid mounting - Yi
> 4) Add flux-cleaning step in the document - Yi
> 5) Document the mechanical structure and hybrid assembly QC criteria - Yi
>
> Hybrid/T-board/Inner Signal Cable/Patch Panel Board/Back of Crate Board:
> 1) Update the T-board design to avoid the conflict with Mechanical
> structure - Jianing/Maowu/Gerard
> 2) Check how T-board would mount onto MS, and fix cables -
> Jianing/Maowu/Mike/Gerard
> 3) Look into splitting the inner and outer sensor HV bias -
> Mike/Gerard/Christian
> 4) Send the problematic prototype cable-T-board assembly to Mike for
> investigation - Zhenyu/Mike
> 5) Develop the QC procedure for Inner cable and T-board assembly -
> Mike/Maowu
>
> Production Module assembly:
> 1) Discuss with Fermilab about production module assembly schedule -
> Zhenyu/Xu
> 2) Design and fabricate module storage boxes for production at UIC -
> Xu/Andres
> 3) Duplicate the module assembly tooling at UIC - Xu/Zhenyu
>
> Prototype Module test:
> 1) Look into the overall large CMN noise, and the abnormal noise of few
> channels first appear in the readout - Gerard/Xu
> 2) Check the FST noise performance at high readout rate - Xu
> 3) Use the laser test stand to characterize prototype module performance
> - Andres/Zhenyu
> 4) Test stand setup at BNL - Prithwish/Hu
>
> Software:
> 1) Prepare FST offline software - Shenghui/Xu
> 2) Detector slow control - Xu
> 3) Cooling system slow control - Prithwish/Hu
>
>> On Aug 14, 2020, at 9:42 PM, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
>>
>> Dear all,
>>
>> We will have the Weekly FST meeting on Monday starting at 9am EST (BNL
>> local time).
>>
>> Bluejeans Meeting URL https://bluejeans.com/101020434
>> Meeting ID: 101 020 434
>>
>> https://drupal.star.bnl.gov/STAR/event/2020/08/17/star-forward-silicon-tracker-meeting
>>
>> 0. follow-ups on review and action items *
>> 1. Integration
>> by Rahul Sharma, Felix Archampong
>> 2. Hybrid, T-board
>> by Maowu Nie, Gerard Visser
>> 3. Patch panel boards and ABC boards by Mike
>> Capotosto, Gerard Visser
>> 4. Simulation Studies
>> by Shenghui Zhang
>> 5. Prototype Module Test by
>> Xu Sun, Gavin Wilks
>> 6. Mechanical structure by
>> Yi Yang
>>
>> *
>> https://drupal.star.bnl.gov/STAR/event/2020/08/17/star-forward-silicon-tracker-meeting/follow-review-and-action-items
>> _______________________________________________
>> Star-fst-l mailing list
>> Star-fst-l AT lists.bnl.gov
>> https://lists.bnl.gov/mailman/listinfo/star-fst-l
>
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l
>
>
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l
-
[Star-fst-l] Weekly FST meeting, August 17 9am (BNL time),
Ye, Zhenyu, 08/14/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 17 9am (BNL time),
Gerard Visser, 08/16/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 17 9am (BNL time),
Capotosto, Michael, 08/16/2020
- Re: [Star-fst-l] Weekly FST meeting, August 17 9am (BNL time), Zhang, Shenghui, 08/17/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 17 9am (BNL time),
Capotosto, Michael, 08/16/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 17 9am (BNL time),
Ye, Zhenyu, 08/17/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 17 9am (BNL time),
Christie, William, 08/17/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 17 9am (BNL time),
Ye, Zhenyu, 08/17/2020
- Re: [Star-fst-l] Weekly FST meeting, August 17 9am (BNL time), Stephen Trentalange, 08/17/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 17 9am (BNL time),
Ye, Zhenyu, 08/17/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 17 9am (BNL time),
Gerard Visser, 08/18/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 17 9am (BNL time),
Ye, Zhenyu, 08/19/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 17 9am (BNL time),
Yi Yang, 08/19/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 17 9am (BNL time),
Ye, Zhenyu, 08/31/2020
- Re: [Star-fst-l] Weekly FST meeting, August 17 9am (BNL time), Gerard Visser, 08/31/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 17 9am (BNL time),
Ye, Zhenyu, 08/31/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 17 9am (BNL time),
Yi Yang, 08/19/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 17 9am (BNL time),
Ye, Zhenyu, 08/19/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 17 9am (BNL time),
Christie, William, 08/17/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 17 9am (BNL time),
Gerard Visser, 08/16/2020
Archive powered by MHonArc 2.6.24.