Hey All,
I won't be able to make it to the meeting tomorrow.
Update on status of the existing test-stand cables: I've received two
cable/T-Board assemblies from Zhenyu, but haven't modified them (re-pinned
the bias pins) yet.
Production run of new cables:
- I have in-hand parts to make 50 cable assemblies, as well as the
purple cable itself.
- I haven't gotten a quote for the production run cable assembly and
soldering to T-boards. I can ask our vendor to work on a quote if you guys
give me a timeframe when we'll have them in hand, when we need them returned
by, and how many we want to have made.
- We can split the job as well - have our vendor install the D-Sub
connectors and prep the cable to be soldered to the T-board, and have the
soldering to the T-Boards done in China, if that's a preferred option. You
guys may have better labor rates, if cost becomes a concern.
T-Board Testing:
- I drew up a schematic for a little Arduino based cable tester,
attached. It'll cost ~$2,200 to have the boards assembled on a 10 day turn.
- Haven't heard back from Gerard on this. Not sure it's worth the
cost over visual inspection or point to point testing
- It'll drive each pin of the d-sub and scan through all the
pins of the Nicomatic connector, check for opens and shorts.
- I2C interface to read in temp sensor value, make sure it's
within some reasonable range of room temperature.
Thanks
--Mike
-----Original Message-----
From: Star-fst-l <star-fst-l-bounces AT lists.bnl.gov> On Behalf Of videbaek
Sent: Friday, October 30, 2020 5:08 PM
To: Aschenauer, Elke <elke AT bnl.gov>
Cc: Star-fst L <star-fst-l AT lists.bnl.gov>
Subject: Re: [Star-fst-l] Weekly FST meeting, Nov 2 8:30am (BNL time) ---
Time change in the US
Hi Zhenyu,
Maybe people can send a brief message to the list on progress since last week
if they cannot attend.
best F.
On 2020-10-30 16:41, Aschenauer Elke-Caroline wrote:
> Dear Zhenyu,
>
> most of us will not be able to join on monday as we do have the sTGC
> readiness review
>
> Cheers elke
>
>> On Oct 30, 2020, at 15:58, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
>>
>> Dear all,
>>
>> We will have the Weekly FST meeting on Monday starting at 8:30am EST
>> (BNL local time).
>>
>> Please note that Daylight Saving Time in the US will end on Sunday
>> Nov 1, i.e.
>> Sunday, November 1, 2020, 2:00:00 am clocks are turned backward 1
>> hour to Sunday, November 1, 2020, 1:00:00 am local standard time
>> instead.
>>
>>
> https://drupal.star.bnl.gov/STAR/event/2020/11/02/star-forward-silicon
> -tracker-meeting
>>
>> 0. follow-ups on review and action items *
>> 1. Integration by Rahul Sharma, Felix Archampong
>> 2. T-board and Inner Signal Cables by
>> Maowu Nie, Michael Capotosto
>> 3. Mechanical structure
>> by Yi Yang
>> 4. Production module assembly by
>> Xu Sun
>>
>> *
>>
> https://drupal.star.bnl.gov/STAR/event/2020/11/02/star-forward-silicon
> -tracker-meeting/follow-action-items
>>
>> Zhenyu
>>
>> ********** ZOOM Meeting ********** **********
>> ID: 879 0430 2955
>> Passcode: fSTAR2021
>> ********** ********** ********** ********** *******
>> _______________________________________________
>> Star-fst-l mailing list
>> Star-fst-l AT lists.bnl.gov
>> https://lists.bnl.gov/mailman/listinfo/star-fst-l
>
> _Note: Please do not feel obligated to respond to this message outside
> of your work hours._
>
> ( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-
>
> ) `\ +
> / '. | Elke-Caroline Aschenauer (she/her/hers) =
> | `, -
> \,_ `-/ Brookhaven National Lab +
> ,&&&&&V Physics Dept., 25 Corona Road =
> ,&&&&&&&&: Bldg. 510 /2-195 Rocky Point, NY, -
> ,&&&&&&&&&&; 20 Pennsylvania Avenue 11778 +
> | |&&&&&&&;\ Upton, NY 11973
> =
> | | :_) _ Tel.: 001-631-344-4769 Tel.: +1-631-569-4290
> -
> | | ;--' | Cell-USA: +1-757-2565224
> +
> '--' `-.--. | Cell-Europe:
> +49152220025211 =
> \_ | |—‘
> -
>
> `-._\__/ Mail: elke AT bnl.gov elke.caroline AT me.com
> +
>
> +=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l
--
Flemming Videbaek
senior scientist
videbaek @ bnl.gov
Brookhaven National Lab
Physics Department
Bldg 510D
Upton, NY 11973
phone: 631-344-4106
cell : 631-681-1596
_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l
Attachment:
T-Board V3 Assembly Testbed 11-1-2020.pdf
Description: T-Board V3 Assembly Testbed 11-1-2020.pdf
- Re: [Star-fst-l] Weekly FST meeting, Nov 2 8:30am (BNL time) --- Time change in the US, Capotosto, Michael, 11/01/2020
Archive powered by MHonArc 2.6.24.