hi Xu,
My only comment is I do not see what the possible advantages are of 'plan B' slow controls. I think this should be clarified and a decision taken to do the controls one way or the oter, rather than working on both approaches.
As far as the test at STAR, where will the FST module be located? (3rd floor of platform?) Is someone taking care of running the gray cable(s) for that? And BTW let's use one of the readout crates that modules have not been borrowed out of, for simplicity.
Thanks,
Gerard
On 11/12/2020 12:27 AM, Xu Sun wrote:
Hi All,
I had a discussion with Prithwish, Yu and Zhenyu about the FST integration test today. Zhenyu asked me to write down the plan and share with the group.
Please find the FST integration test plan in the following link:
https://drupal.star.bnl.gov/STAR/system/files/FstSlowControlandIntegrationTestPlan.pdf
Comments and suggestions are welcome.
Best,
Xu
_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l
-
[Star-fst-l] FST Integration Test Plan,
Xu Sun, 11/12/2020
-
Re: [Star-fst-l] FST Integration Test Plan,
Gerard Visser, 11/12/2020
- Re: [Star-fst-l] FST Integration Test Plan, Xu Sun, 11/13/2020
-
Re: [Star-fst-l] FST Integration Test Plan,
Gerard Visser, 11/12/2020
Archive powered by MHonArc 2.6.24.