Hello All,

 

This is email is to update everyone about the latest PEEK structures that was sent to me.

  • Released date: 2020.08.19

 

Dimension Unit- Inches

 

 

 

Thanks and have a great day

 

 

THIS E-MAIL AND ANY ATTACHED FILES ARE CONFIDENTIAL AND MAY BE LEGALLY PRIVILEGED.

If you are not the addressee, any disclosure, reproduction, copy, distribution, dissemination
or use of this communication is strictly prohibited. If you have received this transmission in
error please notify the sender immediately and then delete this e-mail.

Any statements must be confirmed either by facsimiles transmission or by mail before they will
have legal effect. The sender of this e-mail is not authorized to commit the company in any way
and the addressee is hereby formally notified of that fact.

 

From: Ye, Zhenyu
Sent: Monday, January 25, 2021 10:30 AM
To: Ye, Zhenyu
Cc: Star-fst L
Subject: Re: [Star-fst-l] Weekly FST meeting, Jan 25 8:30am (BNL time)

 

Minutes

 

Production module assembly - Xu

Will start mounting APV chips onto modules this week. Should be able to do four modules with one set of tooling each week. We have 5 A’s, 7 B’s and 3 C’s from NCKU. Discussed which modules to start with and decided to start with the two best ones first, then two more A’s, then B’s for APV mounting.

Parts for two extra sets of tooling are being fabricated at UIC (finish this week) and inspected at Fermilab.

Test stand at Fermilab waiting for ORC review.

 

Geometry update - Flemming

Check if Yi has the final CAD drawings of the disks/modules, and whether they are used by Felix

 

Detector alignment - discussion

Need to do simulation and tracking. Discuss at the incoming software meeting on 2/12

 

Zero suppression for data taking - discussion

Implement the CMN subtraction algorithm in Tonko’s code, and test it with individual module at Clean room and full detector after installation.

 

Zhenyu

 

> On Jan 24, 2021, at 5:45 PM, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:

>

> Dear all,

>

> We will have a weekly FST meeting tomorrow starting at 8:30am EST (BNL local time).

>

> https://drupal.star.bnl.gov/STAR/event/2021/01/25/star-forward-silicon-tracker-meeting

>

> 0. follow-ups on review and action items *

> 1. Integration                                                                                                                by Rahul Sharma, Felix Archampong

> 2. Hybrid and T-board                                                              by Maowu Nie, Mike Capotosto

> 3. Mechanical Structure                                                by Yi Yang

> 4. Production module assembly                                    by Xu Sun

>

> * https://drupal.star.bnl.gov/STAR/event/2021/01/25/star-forward-silicon-tracker-meeting/follow-action-items

>

> Zhenyu

>

> ********** ZOOM Meeting ********** **********

> ID: 879 0430 2955

> Passcode: fSTAR2021

> ********** ********** ********** ********** *******

> _______________________________________________

> Star-fst-l mailing list

> Star-fst-l AT lists.bnl.gov

> https://lists.bnl.gov/mailman/listinfo/star-fst-l

 

_______________________________________________

Star-fst-l mailing list

Star-fst-l AT lists.bnl.gov

https://lists.bnl.gov/mailman/listinfo/star-fst-l

 




Archive powered by MHonArc 2.6.24.

Top of Page