Skip to Content.
Sympa Menu

star-fst-l - Re: [Star-fst-l] Weekly FST meeting, Feb 8 8:30am (BNL time)

star-fst-l AT lists.bnl.gov

Subject: Star-fst-l mailing list

List archive

Chronological Thread  
  • From: Felix Archampong <felixarchampong AT yahoo.com>
  • To: Zhenyu Ye <yezhenyu2003 AT gmail.com>, L Star-fst <star-fst-l AT lists.bnl.gov>, Yi Yang <yiyang AT ncku.edu.tw>
  • Subject: Re: [Star-fst-l] Weekly FST meeting, Feb 8 8:30am (BNL time)
  • Date: Mon, 8 Feb 2021 10:28:09 -0500

 

 

Hello All,

 

I have attached the complete module (CAD file) of the FST Experiment to this email. This is the latest file that is in circulation. Please verify and coordinate accordingly to make sure we all have the same parts.

 

This is the link to the file:

File name to open (Top Assembly): FST Assembly.iam

 

Action Items:

Reference document is attached to this email.

  • See picture below (Fig A) to resolve and document the process. Attention- Gerard

What is available:

  • Hole size for the Grounding T-board to Aluminum structure à #10 x 10-32 UNF - 2B Threaded screw hole.

What is needed:

  • The wire gauge and connection from T-Board to the body of the Aluminum structure.

 

Fig A.

 

Thanks and have a great day

 

 

THIS E-MAIL AND ANY ATTACHED FILES ARE CONFIDENTIAL AND MAY BE LEGALLY PRIVILEGED.

If you are not the addressee, any disclosure, reproduction, copy, distribution, dissemination
or use of this communication is strictly prohibited. If you have received this transmission in
error please notify the sender immediately and then delete this e-mail.

Any statements must be confirmed either by facsimiles transmission or by mail before they will
have legal effect. The sender of this e-mail is not authorized to commit the company in any way
and the addressee is hereby formally notified of that fact.

 

From: Zhenyu Ye
Sent: Sunday, February 7, 2021 1:14 PM
To: L Star-fst
Subject: [Star-fst-l] Weekly FST meeting, Feb 8 8:30am (BNL time)

 

Dear all,

 

We will have a weekly FST meeting tomorrow starting at 8:30am EST (BNL local time).

 

https://drupal.star.bnl.gov/STAR/event/2021/02/08/star-forward-silicon-tracker-meeting

 

0. follow-ups on review and action items *

1. Integration                                                                                                                    by Rahul Sharma, Felix Archampong

2. Hybrid and T-board                                                  by Maowu Nie, Mike Capotosto

3. Mechanical Structure                                                by Yi Yang

4. Production module assembly                                    by Xu Sun

 

* https://drupal.star.bnl.gov/STAR/event/2021/02/08/star-forward-silicon-tracker-meeting/follow-action-items

 

Zhenyu

 

********** ZOOM Meeting ********** **********

ID: 879 0430 2955

Passcode: fSTAR2021

********** ********** ********** ********** *******

_______________________________________________

Star-fst-l mailing list

Star-fst-l AT lists.bnl.gov

https://lists.bnl.gov/mailman/listinfo/star-fst-l

 

Attachment: FST Assembly.pdf
Description: Adobe PDF document

Attachment: FST Installation.pdf
Description: Adobe PDF document




Archive powered by MHonArc 2.6.24.

Top of Page