Skip to Content.
Sympa Menu

star-fst-l - Re: [Star-fst-l] Weekly FST meeting, Feb 22 8:30am (BNL time)

star-fst-l AT lists.bnl.gov

Subject: Star-fst-l mailing list

List archive

Chronological Thread  
  • From: Xu Sun <sunxuhit AT gmail.com>
  • To: "Ye, Zhenyu" <yezhenyu AT uic.edu>
  • Cc: Star-fst L <star-fst-l AT lists.bnl.gov>
  • Subject: Re: [Star-fst-l] Weekly FST meeting, Feb 22 8:30am (BNL time)
  • Date: Mon, 22 Feb 2021 16:03:55 -0600

Hi Zhenyu, Mike and Felix,

Please find the ground connection for the cooling test in the following link:

Unfortunately, I didn't document the gauge of grounding wire used for cooling, but Mike might know.

Best,

Xu

On Mon, Feb 22, 2021 at 8:50 AM Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
Module assembly at NCKU and UIC/Fermilab on-going

Action items -

1. Cables:
SDU starts the assembly of the other 40 T-boards
Mike do QA on the 4 purple cables and send good ones to UIC
Mike send two gray cables to UIC
Mike will order 23 more connectors for T-board
UIC send 2 bad purple cables and 1 bad grey cable to Mike for investigation

2. Grounding
Xu will document the ground connection for the cooling test
Mike and Felix will look into how to make the physical ground connection (connect each cooling tube to the associated T-board, connect one of the T-boards to Aluminum ring structure).

3. Integration
Bob will assemble cooling system after sTGC work and receiving NOVEC
Rahul will look into whether it is possible to adjust the rings/rails in-situ, and assemble the support structure in the clean room
Yi will send BNL 4-5 more bad-quality modules
NCKU (Han-Sheng) will check the FST CAD drawings from Felix to make sure the geometry model for FST detector module is up-to-date

4. Software
Daniel will send Gavin the latest tracking code


> On Feb 20, 2021, at 1:12 AM, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
>
> Dear all,
>
> We will have a weekly FST meeting tomorrow starting at 8:30am EST (BNL local time).
>
> https://drupal.star.bnl.gov/STAR/event/2021/02/22/star-forward-silicon-tracker-meeting
>
> 0. follow-ups on review and action items *
> 1. Integration                                                                      by Rahul Sharma, Felix Archampong
> 2. Hybrid and T-board                                                       by Maowu Nie, Mike Capotosto
> 3. Mechanical Structure                                                by Yi Yang
> 4. Production module assembly                                    by Xu Sun/Shenghui Zhang
>
> * https://drupal.star.bnl.gov/STAR/event/2021/02/22/star-forward-silicon-tracker-meeting/follow-action-items
>
> Zhenyu
>
> ********** ZOOM Meeting ********** **********
> ID: 879 0430 2955
> Passcode: fSTAR2021
> ********** ********** ********** ********** *******
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l

_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l



Archive powered by MHonArc 2.6.24.

Top of Page