Status
The detector is now pushed inside the cone but still on the installation tool.
All the purple cables are now connected to PPBs, did a pedestal run for all
of the modules with HV off, and with HV on for one section which is sitting
innermost. The pedestals and noises look reasonable.
Plan for tomorrow
We will test the cooling tomorrow when the cooling unit is ready. If no
leakage, the detector will be detached from the installation tool and be
fully pushed in.
Plan for rest of the week
Put a cover on the cone to block the light so that we can turn on all the HV.
Run cooling continuously.
If both are fine, we call the installation a success
Zhenyu
> On Aug 10, 2021, at 10:54 PM, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
>
> Thanks to Rahul/Bob Soja/Greg and people from CAD, around 4pm this
> afternoon, both detector halves were
> mounted on the installation tool on the TPC endcap.
>
> We took some data with one detector module. Assuming the data are fine,
> tomorrow morning 9am a BNL
> photographer will come to take some pictures. Then we will insert the
> detector into the TPC cone. Another
> photo session will take place next Monday 10am.
>
> Zhenyu
>
>
>
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://nam04.safelinks.protection.outlook.com/?url=https%3A%2F%2Flists.bnl.gov%2Fmailman%2Flistinfo%2Fstar-fst-l&data=04%7C01%7Cyezhenyu%40uic.edu%7C2daa01a1e75b4500461508d95c736547%7Ce202cd477a564baa99e3e3b71a7c77dd%7C0%7C0%7C637642472966507413%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=OCjNvb5hUrT6%2Fgl2qdEi9cu5KTPNjh43K%2Fzhej4Tcck%3D&reserved=0
Attachment:
smime.p7s
Description: S/MIME cryptographic signature
-
[Star-fst-l] Installation Status,
Ye, Zhenyu, 08/10/2021
- Re: [Star-fst-l] Installation Status, Ye, Zhenyu, 08/11/2021
Archive powered by MHonArc 2.6.24.