Dear Rahul and Zhenyu,

I was  wondering we have installed temperature sensors or have temperature sensors in locations, so we can monitor the temperature of the Si during the backe-out.
I think this is an absolute must and we cannot start takeout before this is not done.

Regards elke

On Dec 29, 2022, at 17:07, Sharma, Rahul via Star-ops-l <star-ops-l AT lists.bnl.gov> wrote:

Dear All,
 
Here are a few updates for all of you.
 
  1. Fixed Target is installed and beam pipe is closed.
  2. FST Detector is extracted and bakeout jackets are on the beampipe. Everything looks good.
  3. We are preparing for bakeout. Bakeout will start on Tuesday.
 
Check the attached updated schedule. For tasks coming up.
 
Regarding EEMC. I gave will Jacobs 3 weeks. He can come in any time during those weeks and finish his work.
 
eTOF group should finish there work before East Poletip is closed .
 
Let me know in case of any questions or concerns. 
 
  • Rahul
<2022 Shutdown Schedule_Dec29.pdf>_______________________________________________
Star-ops-l mailing list
Star-ops-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-ops-l

Note: Please do not feel obligated to respond to this message outside of your work hours.

 ( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-
  )    `\                                                      +
 /    '. |        Elke-Caroline Aschenauer  (she/her/hers)      =
 |       `,                                                      -
  \,_  `-/        Brookhaven National Lab                         +
  ,&&&&&V         Physics Dept.,            25 Corona Road         =
 ,&&&&&&&&:       Bldg. 510 /2-195          Rocky Point, NY,        -
,&&&&&&&&&&;      20 Pennsylvania Avenue                 11778       +
|  |&&&&&&&;\     Upton, NY 11973                                     =
|  |       :_) _  Tel.:  001-631-344-4769   Tel.:   +1-631-569-4290    -
|  |       ;--' |                           Cell-USA:  +1-757-2565224   +
'--'   `-.--.   |                           Cell-Europe: +49152220025211 =
   \_    |  |—‘                                                           -
     `-._\__/     Mail: elke AT bnl.gov        elke.caroline AT me.com           +
            +=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=



Attachment: smime.p7s
Description: S/MIME cryptographic signature



  • Re: [Star-fst-l] [Star-ops-l] STAR Shutdown Schedule, Aschenauer, Elke, 12/31/2022

Archive powered by MHonArc 2.6.24.

Top of Page