Skip to Content.
Sympa Menu

star-qaboard-l - Re: [STAR-QAboard] Run-20 QA Meeting, tomorrow at noon (EDT)

star-qaboard-l@lists.bnl.gov

Subject: STAR QA Board

List archive

Chronological Thread  
  • From: marr <marr@rcf.rhic.bnl.gov>
  • To: "Van Buren, Gene" <gene@bnl.gov>
  • Cc: Kaifeng Shen via STAR-QAboard-l <star-qaboard-l@lists.bnl.gov>
  • Subject: Re: [STAR-QAboard] Run-20 QA Meeting, tomorrow at noon (EDT)
  • Date: Sun, 19 Jul 2020 23:40:02 -0400

Hello Gene

I have checked the dz distributions for injection and non-injection runs (https://drupal.star.bnl.gov/STAR/system/files/Comp_Dz_Run19_19p6_0.pdf), and they look similar.

Best
Rongrong

On 2020-07-17 17:03, Van Buren, Gene via STAR-QAboard-l wrote:
Hi, all

Here are the lists I promised of runs from Run 19 19.6 GeV:

245 definitively injection runs:
~genevb/public/injectionRuns_Run19_19p6

813 definitively non-injections runs:
~genevb/public/nonInjectionRuns_Run19_19p6

Injection is defined to have ended at the time when the product of the
number of ions in the two beams is maximal for each fill.

The remainder of runs not included in these lists are mostly runs that
span both injection and non-injection periods of the fill. Many
overlap the two by significant time, and some by just a few seconds
which may be due to an uncertainty of a few seconds in determining the
injection-ending.

Thanks,
-Gene
_______________________________________________
STAR-QAboard-l mailing list
STAR-QAboard-l@lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-qaboard-l




Archive powered by MHonArc 2.6.24.

Top of Page