Hi all:
A brief minutes for today's meeting:
1. 19.6 GeV Run-by-Run QA:
Comments:
1). RunID 450 to 500, the jump in eta/phi plot likely due to the RDO problems during this runing period.
2). At the beginning of the run, the beam is not centered, so there is shift in eta;
Things to do:
1). Compare the bad run-list to those points that outside the normal ranges, see if there is plotting issues;
2). Check the RunLog to find out the possible reasons for the bad runs;
3). Check other variables like Q;
4). Change the tolerance from 5sigma to 3sigma, to check the sensitivity of cuts.
Conclusion:
Need to do some checks, but the run list after this QA is good enough for centrality.
2. Discussion:
1). Centrality group is fine with using DCA, but will also monitor the sDCA. May change DCA to sDCA after having a good understanding of this variable.
2). Yu Hu will update the code in Github.
3) We are 80% of the way through 14.6 GeV production. 14.6 GeV QA will start ASAP after the data production is done.
4) For FXT run QA, need a few changes eg. need to change RefMult to number of primary tracks, shift vr cuts. Each working group should think about the changes on QA.
Best,
Ting
_______________________________________________
STAR-QAboard-l mailing list
STAR-QAboard-l@lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-qaboard-l
Attachment:
19.6 GeV Bad Runs List.xlsx
Description: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
-
Re: [STAR-QAboard] QA Board Meeting 10/29,
Daniel Cebra, 11/02/2021
- Re: [STAR-QAboard] QA Board Meeting 10/29, videbaek, 11/02/2021
Archive powered by MHonArc 2.6.24.